Inspections for the day of: Thursday, April 2, 2015.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD15-00120 FIRE-Final Inspection4/2/20154/2/20154/3/2015 6:55:02 AMPCANC
FIR14-00912 INSP-Sprinkler Rough-in4/1/20154/2/20154/2/2015 4:28:23 PMPPART
Initial walkthrough completed- items noted include; overspaced coverage at one location in the basement, DSW not yet installed at the basement, PIV and FDC must remain accessible, heat trace and insulation fill at the combustible concealed space grade level not yet complete, provide an intermediate temp head below the second floor skylight.
________________
Add by TRF 4/06/2015
The sprinkler in the opening on the porch is incorrect it is a QR pendent. The sprinkler is supposed to be a horizontal sidewall spraying DOWN to create a water curtian affect.
BLD15-00639 FIRE-Final Inspection4/2/20154/2/20154/2/2015 4:23:05 PMPFAIL
Modifications to the existing fire sprinkler system will be necessary due to remodel work. Refer to permit documents and approved plan notes sheet A2.1.
BLD14-01937 FIRE-Conference4/2/20154/2/20154/2/2015 4:18:25 PMPDONE
Regarding project related fire sprinkler work.
BLD15-00354 FIRE-Final Inspection4/2/20154/2/20154/2/2015 4:16:54 PMPNR
Project is not in condition for inspection at this time- Construction underway.
FIR14-00673 INSP-Final Inspection4/1/20154/2/20154/2/2015 12:37:46 PMAPASS
Fire sprinkler permit finaled.
FIR14-00600 INSP-Final Inspection4/1/20154/2/20154/2/2015 12:36:50 PMAPASS
Fire sprinkler permit finaled.
FIR14-00814 INSP-Final Inspection4/2/20154/2/20154/2/2015 9:33:50 AMPPASS
UG fire supply line permit final approved.
FIR14-00867 INSP-Final Inspection4/2/20154/2/20154/2/2015 9:31:11 AMAPASS
Final walkthrough and acceptance testing completed acceptable. Fire sprinkler permit finaled.
FIR14-00810 INSP-Final Inspection4/1/20154/2/20154/2/2015 9:29:02 AMAPASS
Fire alarm testing completed satisfactory. Permit finaled.