BLD14-02182
| BLD-Wall Bracing | 4/1/2015 | 4/2/2015 | 4/2/2015 4:20:23 PM | P | PASS |
|
|
Shear // Josh Phone #: ###-####,, shear ok
|
BLD14-02718
| BLD-Final | 4/2/2015 | 4/2/2015 | 4/2/2015 4:18:49 PM | P | FAIL |
|
|
David Phone #: ###-####,, need egress out of basement bedrooms per code,, need plans,, need to verify set back on garage,, fence is positioned to the north of the south property line,, etc
|
BLD14-02673
| BLD-Final | 3/30/2015 | 4/2/2015 | 4/2/2015 4:10:42 PM | P | PEND |
|
|
Key to access front door is in the weather proof outlet on front porch. Please call me with any questions. Thanks, Kim Phone #: ###-#### Inspection requested via web by Kim Winkle
|
BLD13-01397
| BLD-Final | 3/30/2015 | 4/2/2015 | 4/2/2015 4:08:28 PM | P | FAIL |
|
|
David Phone #: ###-####,, need: plans, hill side, temp glass, guardrail engineering,, rise and run of stairs,, garage step,, open risers more than 4",, insulated door to crawl,, hand rails per code,, inside and out per code,, etc
|
BLD13-02551
| BLD-Conference | 3/31/2015 | 4/2/2015 | 4/2/2015 2:52:24 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Rex Beaver,, need to justify extra dead load of the tiles vs. shake roof,, engineering?
|
BLD14-00897
| BLD-Final | 3/30/2015 | 4/2/2015 | 4/2/2015 2:46:09 PM | P | PEND |
|
|
Phone #: 2088506700 >> Inspection requested via mobile web by Chad
|
BLD14-03579
| BLD-Energy code compliance | 4/2/2015 | 4/2/2015 | 4/2/2015 11:42:27 AM | P | CANC |
|
|
interior perimeter wall rigid board, after 1:30 thanks Miles Phone #: ###-#### >> Inspection requested via web by Miles Hash Inspection cancelled from web by: Miles Hash
|
BLD14-03683
| BLD-Foundation | 4/1/2015 | 4/2/2015 | 4/1/2015 4:34:47 PM | A | CANC |
|
|
Mana Phone #: ###-####,, late am
|