PLM17-00876
| Water and/or Sewer | 3/31/2017 | 4/2/2017 | 4/2/2017 3:29:50 PM | P | CANC |
|
|
220' of sewer installed at 1% at this time.. Still need tested and camera.
|
PLM17-00876
| Water and/or Sewer | 3/31/2017 | 4/2/2017 | 4/2/2017 9:47:37 AM | A | PART |
|
|
135' of sewer installed at 1% at this time.. Still need tested and camera.
|