Inspections for the day of: Thursday, April 2, 2020.
Number of inspections: 2
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDan Ediger
TitlePLM-INSPECTOR
Phone #869-5166
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM20-01447 Final4/2/20204/2/20204/2/2020 11:21:36 AMPFAIL
casey Phone #: ###-####
1. Install an ASSE1070 tempering valve and ADA trap protector on lavatory.
2. ADA WC must be Right hand flush.
PLM19-00526 Final4/1/20204/2/20204/2/2020 11:15:28 AMAFAIL
Casey Phone #: 208-809-089
1. Fasten mop basin to the floor and wall then seal.
2. Certify backflow.
3. Permcap 2" pipe in mechanical room.
4. T&P drain must be 6" off the floor.
5. ADA WC must be right hand flush.