Inspections for the day of: Thursday, April 2, 2020.
Number of inspections: 24
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTell Riley
TitleBLD-COM/RES INSPECTOR
Phone #830-2752
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD19-03532 BLD-Aging Inspection4/2/20204/2/20204/9/2020 8:45:05 AM PEND
BLD19-00680 BLD-Aging Inspection4/2/20204/2/20204/7/2020 7:15:32 AM PEND
BLD19-03249 BLD-Energy code compliance4/1/20204/2/20204/2/2020 3:14:16 PMPNR
Phone #: ###-#### Inspection requested via web by Carl Funk/need to see length of lags used in ledger areas, boxes onsite are 6" and some areas would require a 10" lag for the 3" minimum needed per plans//will check other corrections when re-schedule//
BLD19-03250 BLD-Energy code compliance4/1/20204/2/20204/2/2020 3:13:58 PMPNR
Phone #: ###-#### Inspection requested via web by Carl Funk/need to see length of lags used in ledger areas, boxes onsite are 6" and some areas would require a 10" lag for the 3" minimum needed per plans//will check other corrections when re-schedule//
BLD19-03251 BLD-Energy code compliance4/1/20204/2/20204/2/2020 3:13:12 PMPNR
Phone #: ###-#### Inspection requested via web by Carl Funk/need to see length of lags used in ledger areas, boxes onsite are 6" and some areas would require a 10" lag for the 3" minimum needed per plans//will check other corrections when re-schedule//
BLD19-03252 BLD-Energy code compliance4/1/20204/2/20204/2/2020 3:12:51 PMPNR
Phone #: ###-#### Inspection requested via web by Carl Funk//need to see length of lags used in ledger areas, boxes onsite are 6" and some areas would require a 10" lag for the 3" minimum needed per plans//will check other corrections when re-schedule//
BLD19-03229 BLD-Energy code compliance4/1/20204/2/20204/2/2020 1:53:31 PMPPASS
Tell can you text me your Email address so I can send you the engineering on the floor joist and also from Kolby Thanks Carl Phone #: ###-#### Inspection requested via web by Carl Funk//framing corrections noted, framing was walked through with design engineer, noted changes were approved by engineer//joist were ok per LP engineer//insulation ok//
BLD19-03253 BLD-Energy code compliance4/1/20204/2/20204/2/2020 1:53:08 PMPPASS
Phone #: ###-#### Inspection requested via web by Carl Funk//framing corrections noted, framing was walked through with design engineer, noted changes were approved by engineer//joist were ok per LP engineer//insulation ok//
BLD19-03247 BLD-Energy code compliance4/1/20204/2/20204/2/2020 1:52:51 PMPPASS
Phone #: ###-#### Inspection requested via web by Carl Funk//framing corrections noted, framing was walked through with design engineer, noted changes were approved by engineer//joist were ok per LP engineer//insulation ok//
BLD19-03248 BLD-Energy code compliance4/1/20204/2/20204/2/2020 1:52:33 PMPPASS
Phone #: ###-#### Inspection requested via web by Carl Funk//framing corrections noted, framing was walked through with design engineer, noted changes were approved by engineer//joist were ok per LP engineer//insulation ok//
BLD19-04773 BLD-Concrete4/2/20204/2/20204/2/2020 1:31:06 PMPPASS
Phone #: ###-#### Inspection requested via web by Shane Shade//vapor barrier and insulation ok//
BLD19-04772 BLD-Concrete4/2/20204/2/20204/2/2020 1:30:49 PMPPASS
Phone #: ###-#### Inspection requested via web by Shane Shade//vapor barrier and insulation ok//
BLD19-04770 BLD-Concrete4/2/20204/2/20204/2/2020 1:29:40 PMPPASS
Phone #: ###-#### Inspection requested via web by Shane Shade//vapor barrier and insulation ok//
BLD19-04767 BLD-Concrete4/2/20204/2/20204/2/2020 1:29:19 PMPPASS
Phone #: ###-#### Inspection requested via web by Shane Shade//vapor barrier and insulation ok//
BLD19-04651 BLD-Framing/Rough-in4/1/20204/2/20204/2/2020 11:45:05 AMPCANC
Phone #: ###-#### Inspection requested via web by Damion Jordan
BLD20-00354 BLD-Footing4/1/20204/2/20204/2/2020 10:48:51 AMAPART
Pouring at 11 -Tony Phone #: ###-####//setbacks per plans//WIP//
BLD19-04846 BLD-Wall cover4/1/20204/2/20204/2/2020 10:19:55 AMAPASS
Home is vacant. If garage door is open, please walk in. If the garage is closed, please enter: "5050 Enter" on the garage keypad. Could you possibly call me after your inspection to let me know if I can begin to sheetrock right away? Thank you so much, Brandon Phone #: ###-#### Inspection requested via web by Brandon Ornelas
BLD20-00940 BLD-Final4/1/20204/2/20204/2/2020 9:50:25 AMADONE
Shed demo complete. Thank you! Phone #: ###-#### Inspection requested via web by Dale Hope///shed removed//
BLD20-00940 DOC - Permit Finaled4/2/20204/2/20204/2/2020 9:44:34 AMPPASS
BLD19-04394 BLD-Energy code compliance4/1/20204/2/20204/2/2020 9:32:09 AMAPASS
Insulation inspection R-38 closed cell spray in ceiling, bat walls, floor bat done with flooring R-30
Home owner home access site through gate on left of house enter sliding door. room contained away from house members with plastic walls. Phone #: ###-#### Inspection requested via web by Tara Vreeland
BLD19-04772 BLD-Concrete4/2/20204/2/20204/2/2020 7:38:22 AMACANC
Phone #: ###-#### >> Inspection requested via web by Shane Shade Inspection cancelled from web by: Shane Shade
BLD19-04773 BLD-Concrete4/2/20204/2/20204/2/2020 7:38:14 AMACANC
Phone #: ###-#### >> Inspection requested via web by Shane Shade Inspection cancelled from web by: Shane Shade
BLD19-04770 BLD-Concrete4/2/20204/2/20204/2/2020 7:38:11 AMACANC
Phone #: ###-#### >> Inspection requested via web by Shane Shade Inspection cancelled from web by: Shane Shade
BLD19-04767 BLD-Concrete4/2/20204/2/20204/2/2020 7:38:07 AMACANC
Phone #: ###-#### >> Inspection requested via web by Shane Shade Inspection cancelled from web by: Shane Shade