BLD95-00567
| INSP - Flatwork | 4/20/1996 | 4/20/1996 | 4/20/1996 12:00:00 AM | | PART |
|
|
/ / 342 -
|
BLD95-00567
| INSP - Flatwork | 4/20/1996 | 4/20/1996 | 4/20/1996 12:00:00 AM | | FAIL |
|
|
/ / 342 - cover inadequate, rebar tied to conduit, added bar not corre
|
BLD95-01675
| INSP - Conference | 4/20/1996 | 4/20/1996 | 4/20/1996 12:00:00 AM | | PART |
|
|
/ / 342 - handrails, guardrails, fire resistive const
|
BLD95-01730
| INSP - Footings | 4/20/1996 | 4/20/1996 | 4/20/1996 12:00:00 AM | | FAIL |
|
|
/ / 342 - poured w/o insp....rejected
|
BLD96-00201
| INSP - Footings | 4/20/1996 | 4/20/1996 | 4/20/1996 12:00:00 AM | | NR |
|
|
/ / 342 -
|
BLD96-00327
| INSP - Footings | 4/20/1996 | 4/20/1996 | 4/20/1996 12:00:00 AM | | NR |
|
|
/ / 342 - 2nd time
|
BLD96-00931
| INSP - Framing/Rough-in | 4/20/1996 | 4/20/1996 | 4/20/1996 12:00:00 AM | | CANC |
|
|
04/26/96 342 - part of room
|