Inspections for the day of: Thursday, April 20, 2000.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Storey
TitleBLD-COM/RES INSPECTOR
Phone #794-9490
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-00051 BLD-Final4/19/20004/20/20004/20/2000 12:00:00 AMAPASS
###-####
BLD00-00524 BLD-Framing/Rough-in4/19/20004/20/20004/20/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 04/19/2000 at 13:41:55. Contact: ###-####. framing ok e.c. ok 4/20/00 3:11:05 PM
BLD99-02727 BLD-Conference4/19/20004/20/20004/20/2000 12:00:00 AMAPASS
shear wall insp we are planning on siding on friday jeff ###-#### exterior nailling ok. 4/20/00 3:13:48 PM
BLD99-02161 BLD-Final4/19/20004/20/20004/20/2000 12:00:00 AMAPART
###-#### temp occ ok letter on site for south end of bldg. on site to verrify that all inspectors ok with area. 4/20/00 3:13:18 PM
BLD00-00886 BLD-Concrete4/19/20004/20/20004/20/2000 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 04/19/2000 at 16:01:36. Contact: ###-####. placed w/o insp. 4/20/00 3:12:06 PM
BLD00-00849 BLD-Foundation4/20/20004/20/20004/20/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 04/20/2000 at 04:58:23. Contact: ###-####.
BLD00-00850 BLD-Foundation4/20/20004/20/20004/20/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 04/20/2000 at 04:59:39. Contact: ###-####.
BLD00-00851 BLD-Foundation4/20/20004/20/20004/20/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 04/20/2000 at 05:01:00. Contact: ###-####.
BLD00-00997 BLD-Footing4/20/20004/20/20004/20/2000 12:00:00 AMPPART
WILL POUR AT 3:00\\###-#### post ft required to be below frost depth. 4/20/00 2:52:31 PM
BLD00-00619 BLD-Framing/Rough-in4/20/20004/20/20004/20/2000 12:00:00 AMPPASS
###-#### frame and e.c. code ok 4/20/00 2:02:35 PM
BLD99-00986 BLD-Conference4/20/20004/20/20004/20/2000 12:00:00 AMPPASS
Added by Inspector: 301 On 4/20/00 brian w. brought in a sample piece of the handrail that was instaled on the circular stair of this project. I approved the shape and size of this rail section for a one time only to this job only to be ok. this configuration will have to have 1 x .5 tube inlew of 1 x .25 flat bar to molded cap in the future.
BLD00-00310 BLD-Foundation4/19/20004/20/20004/20/2000 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 04/19/2000 at 14:53:48. Contact: ###-####. walls rebar and hold downs ok for placement. 4/20/00 2:02:10 PM