BLD00-00051
| BLD-Final | 4/19/2000 | 4/20/2000 | 4/20/2000 12:00:00 AM | A | PASS |
|
|
###-####
|
BLD00-00524
| BLD-Framing/Rough-in | 4/19/2000 | 4/20/2000 | 4/20/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 04/19/2000 at 13:41:55. Contact: ###-####. framing ok e.c. ok 4/20/00 3:11:05 PM
|
BLD99-02727
| BLD-Conference | 4/19/2000 | 4/20/2000 | 4/20/2000 12:00:00 AM | A | PASS |
|
|
shear wall insp we are planning on siding on friday jeff ###-#### exterior nailling ok. 4/20/00 3:13:48 PM
|
BLD99-02161
| BLD-Final | 4/19/2000 | 4/20/2000 | 4/20/2000 12:00:00 AM | A | PART |
|
|
###-#### temp occ ok letter on site for south end of bldg. on site to verrify that all inspectors ok with area. 4/20/00 3:13:18 PM
|
BLD00-00886
| BLD-Concrete | 4/19/2000 | 4/20/2000 | 4/20/2000 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 04/19/2000 at 16:01:36. Contact: ###-####. placed w/o insp. 4/20/00 3:12:06 PM
|
BLD00-00849
| BLD-Foundation | 4/20/2000 | 4/20/2000 | 4/20/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 04/20/2000 at 04:58:23. Contact: ###-####.
|
BLD00-00850
| BLD-Foundation | 4/20/2000 | 4/20/2000 | 4/20/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 04/20/2000 at 04:59:39. Contact: ###-####.
|
BLD00-00851
| BLD-Foundation | 4/20/2000 | 4/20/2000 | 4/20/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 04/20/2000 at 05:01:00. Contact: ###-####.
|
BLD00-00997
| BLD-Footing | 4/20/2000 | 4/20/2000 | 4/20/2000 12:00:00 AM | P | PART |
|
|
WILL POUR AT 3:00\\###-#### post ft required to be below frost depth. 4/20/00 2:52:31 PM
|
BLD00-00619
| BLD-Framing/Rough-in | 4/20/2000 | 4/20/2000 | 4/20/2000 12:00:00 AM | P | PASS |
|
|
###-#### frame and e.c. code ok 4/20/00 2:02:35 PM
|
BLD99-00986
| BLD-Conference | 4/20/2000 | 4/20/2000 | 4/20/2000 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 301 On 4/20/00 brian w. brought in a sample piece of the handrail that was instaled on the circular stair of this project. I approved the shape and size of this rail section for a one time only to this job only to be ok. this configuration will have to have 1 x .5 tube inlew of 1 x .25 flat bar to molded cap in the future.
|
BLD00-00310
| BLD-Foundation | 4/19/2000 | 4/20/2000 | 4/20/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 04/19/2000 at 14:53:48. Contact: ###-####. walls rebar and hold downs ok for placement. 4/20/00 2:02:10 PM
|