ELE00-00911
| Final | 4/20/2000 | 4/20/2000 | 4/20/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 04/20/2000 at 07:21:07. Contact: ###-####. final ok 4/20/00 1:32:27 PM
|
ELE00-01059
| Final | 4/19/2000 | 4/20/2000 | 4/20/2000 12:00:00 AM | A | PASS |
|
|
###-#### call first Final ok 4/20/00 1:32:16 PM
|
ELE00-01297
| Permanent Service | 4/19/2000 | 4/20/2000 | 4/20/2000 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 04/19/2000 at 13:17:59. Contact: ###-####. Electrode ok 4/20/00 1:32:32 PM
|
ELE00-01375
| Electrical Rough-In | 4/19/2000 | 4/20/2000 | 4/20/2000 12:00:00 AM | P | FAIL |
|
|
1:30\\###-#### This is the time you set up with P.J Grounding neutral size and guy kit. 4/21/00 9:04:03 AM
|
ELE00-01246
| Electrical Rough-In | 4/20/2000 | 4/20/2000 | 4/20/2000 12:00:00 AM | P | FAIL |
|
|
SLAB\\###-#### Failed- conduit in slab already covered T/W elect. contractor. 4/21/00 9:06:00 AM
|
ELE00-01080
| Electrical Rough-In | 4/20/2000 | 4/20/2000 | 4/20/2000 12:00:00 AM | P | PASS |
|
|
CEILING \\###-#### Ok to cover ceiling 4/21/00 9:05:38 AM
|
ELE00-01379
| Final | 4/20/2000 | 4/20/2000 | 4/20/2000 12:00:00 AM | P | PASS |
|
|
###-#### Final ok 4/21/00 9:04:20 AM
|
ELE00-01382
| Rough-In Permanent Service | 4/20/2000 | 4/20/2000 | 4/20/2000 12:00:00 AM | P | PASS |
|
|
###-#### P/S & R/I ok. 4/21/00 9:04:14 AM
|
ELE00-00868
| Final | 4/20/2000 | 4/20/2000 | 4/20/2000 12:00:00 AM | P | FAIL |
|
|
John ###-#### Grounding recep on underground circuit. 4/21/00 9:04:31 AM
|