ELE01-01148
| Final | 4/19/2001 | 4/20/2001 | 4/20/2001 12:00:00 AM | A | PASS |
|
|
Harry ###-####
|
ELE01-00797
| Final | 4/19/2001 | 4/20/2001 | 4/20/2001 12:00:00 AM | A | PASS |
|
|
Ed ###-####
|
ELE01-00616
| Final | 4/19/2001 | 4/20/2001 | 4/20/2001 12:00:00 AM | A | PART |
|
|
fn-- brian-- ###-#### signed T/O heat lamp table using cord for fixed wiring without strain relief 2 receps not working in storage room 4/20/2001 9:27:35 AM
|
ELE01-01261
| Final | 4/19/2001 | 4/20/2001 | 4/20/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by Inspector: 336 On 4/19/2001 1:58:44 PM meet at 8:00 am
|
ELE01-00753
| Electrical Rough-In | 4/19/2001 | 4/20/2001 | 4/20/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 04/19/2001 at 13:40:22. Contact: ###-####.
|
ELE01-01088
| Final | 4/20/2001 | 4/20/2001 | 4/20/2001 12:00:00 AM | P | PASS |
|
|
bob ###-####hot tub
|
ELE01-00693
| Electrical Rough-In | 4/20/2001 | 4/20/2001 | 4/20/2001 12:00:00 AM | P | PART |
|
|
CONFERENCE 12:30 DUAYNE ###-####
|
ELE01-01223
| Final | 4/20/2001 | 4/20/2001 | 4/20/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 04/20/2001 at 10:30:41. Contact: ###-####.P/S U/G N Ok 4/20/2001 2:20:03 PM
|
ELE01-01109
| Permanent Service | 4/20/2001 | 4/20/2001 | 4/20/2001 12:00:00 AM | P | PART |
|
|
jessie ###-#### Ok to energize Sat. 4-21-01 pending inspection Mon. morning P/S U/G R 4/20/2001 1:41:48 PM
|