Inspections for the day of: Friday, April 20, 2001.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJoe Tawney
TitleFIRE INSPECTOR
Phone #340-1295
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-03481 FIRE-Final Inspection4/19/20014/20/20014/20/2001 12:00:00 AMAFAIL
###-#### Reinsp Fail Emerg lights 4/20/2001 11:55:48 AM
FIR01-00149 INSP-Supply line flush4/19/20014/20/20014/20/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 04/19/2001 at 14:55:55. Contact: ###-####. OK on supply line stub in to bldg 4/20/2001 11:55:20 AM
MIS01-00068 FIR-Final4/19/20014/20/20014/20/2001 12:00:00 AMAFAIL
call 1st before insp fn fire-- burke--###-#### Final Fail C/N issued 4/20/2001 11:05:26 AM
BLD01-00079 FIRE-Final Inspection4/19/20014/20/20014/20/2001 12:00:00 AMAFAIL
###-####. 4/20/2001 1:33:41 PM Final Fail C/N issued 4/20/2001 2:27:02 PM
BLD00-02246 FIRE-Conference4/20/20014/20/20014/20/2001 12:00:00 AMPPASS
Leroy ###-#### Conf regarding elevated walkways. 4 ft wide or less does not req spklr protection. 4/20/2001 4:03:24 PM
BLD00-03060 FIRE-Final Inspection4/20/20014/20/20014/20/2001 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 04/20/2001 at 08:43:14. Contact: ###-####. Final Fail Approved plans not on site 4/20/2001 2:44:20 PM
BLD00-03189 FIRE-Final Inspection4/20/20014/20/20014/20/2001 12:00:00 AMPFAIL
###-#### Final Fail C/N issued 4/20/2001 4:00:28 PM
BLD00-03481 BLD-Final4/20/20014/20/20014/20/2001 12:00:00 AMPPASS
Added by Inspector: 406 On 4/20/2001 1:31:04 PM
Reinsp OK for permanant occupancy