Inspections for the day of: Monday, April 20, 2009.
Number of inspections: 20
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorEric Strole
TitlePLM/MEC-INSPECTOR
Phone #794-7913
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC07-01397 Site Final4/20/20094/20/20094/20/2009 4:32:42 PMPPASS
PLM09-00316 Final4/20/20094/20/20094/20/2009 4:09:41 PMPPASS
tim Phone #: ###-####
PLM09-00565 Water and/or Sewer4/20/20094/20/20094/20/2009 3:40:39 PMPPASS
PLM09-00565 DOC - Permit Finaled4/20/20094/20/20094/20/2009 3:40:30 PMPPASS
ESC08-00799 Site Final4/20/20094/20/20094/20/2009 3:33:11 PMPFAIL
front yard is not stablized at this point of time.
ESC07-01518 Site Final4/20/20094/20/20094/20/2009 3:30:28 PMPPASS
ESC07-00229 Site Final4/20/20094/20/20094/20/2009 3:20:28 PMPPASS
PLM09-00464 Water Softner Final4/17/20094/20/20094/20/2009 3:14:55 PMPPASS
air gap installed, please reinspect. thanks! Phone #: ###-#### Internet Inspection Request from: Kerrie Simpson
ESC06-01433 Aging Inspection4/20/20094/20/20094/20/2009 3:10:36 PM PASS
ESC06-01433 Site Final4/20/20094/20/20094/20/2009 3:10:27 PMPPASS
ESC08-00179 General Inspection4/20/20094/20/20094/20/2009 2:36:46 PMPFAIL
left verbal correction with rp to maintain di on north west corner of lot.
PLM09-00388 Sprinkler (Final)4/20/20094/20/20094/20/2009 2:34:52 PMPPART
rpba needs tested & certified
ESC09-00029 Site Preparation4/20/20094/20/20094/20/2009 2:15:02 PMPPASS
ESC09-00139 Site Preparation4/20/20094/20/20094/20/2009 11:43:39 AMAPASS
site looks good, no issues.
PLM09-00556 Groundwork4/19/20094/20/20094/20/2009 11:42:56 AMAPASS
Phone #: ###-#### Internet Inspection Request from: Pat Falls
PLM09-00560 Plumbing Rough-in4/17/20094/20/20094/20/2009 10:28:21 AMAFAIL
Internet Inspection Request from: Erin Whiting- aav can be used for island sinks only, need base of stack c/o for 3" vertical stack.
PLM09-00559 Plumbing Rough-in4/17/20094/20/20094/20/2009 10:26:49 AMAPASS
Internet Inspection Request from: Erin Whiting
PLM09-00561 Plumbing Rough-in4/17/20094/20/20094/20/2009 10:25:48 AMAPASS
Internet Inspection Request from: Erin Whiting
PLM08-02615 Storm Drains4/17/20094/20/20094/20/2009 9:11:47 AMAPASS
ESC09-00168 Site Preparation4/17/20094/20/20094/20/2009 8:10:11 AMPNR