Inspections for the day of: Monday, April 20, 2009.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC08-00532 Site Final4/20/20094/20/20094/20/2009 4:03:59 PMPPASS
ESC09-00035 General Inspection4/20/20094/20/20094/20/2009 3:16:12 PMPPART
Told GC to follow there 404 permit on the Wallings creek crossing for compliance.
ESC06-01435 Aging Inspection4/20/20094/20/20094/20/2009 2:51:50 PM DONE
ESC06-01435 DOC - Permit Expired4/20/20094/20/20094/20/2009 2:51:44 PMPPASS
ESC08-00585 General Inspection4/20/20094/20/20094/20/2009 2:51:06 PM PASS
ESC07-01052 BMP Violation4/16/20094/20/20094/20/2009 1:56:25 PMPCANC
Gave them to 4/21/09 AM due to a conflicting schedule with there work. No later.
ESC09-00029 Site Preparation4/17/20094/20/20094/20/2009 1:55:17 PMPPASS
ESC09-00102 General Inspection4/6/20094/20/20094/20/2009 11:43:38 AMAPASS
Pipe work occuring.
ESC08-00763 Tracking Control4/20/20094/20/20094/20/2009 11:07:06 AMAPASS
ESC09-00158 Site Preparation4/20/20094/20/20094/20/2009 10:43:30 AM NR
ESC08-00924 General Inspection4/17/20094/20/20094/20/2009 9:36:42 AMAFAIL
Correction Notice to RP (via phone call)
Notice post on SWPPP mail box.
1. Pick up all trash debris within project area and place into the trash container that is provided.
2. Maintain silt fence AT THE NORTH WEST end of building.
3. Remove all plastic from the dewatering activities that have been buried or partially buried.
4. Provide a shedule of when final stabilizing activities will be occuring and what area Brown Const. and Sommer Const. are responsible for. Failure to comply by the given time frame will result in a stop work order. Will re-inspect on 04/23/09 AM.