Inspections for the day of: Friday, April 20, 2012.
Number of inspections: 5
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR11-00344 INSP-Conference4/20/20124/20/20124/20/2012 3:27:29 PMPDONE
Art and I discussed what I would need to complete the inspection for this project.
FIR11-00472 INSP-Conference4/20/20124/20/20124/20/2012 3:14:16 PMPDONE
Art and I discussed what I would need to complete the inspection for this project.
FIR11-00638 INSP-Sprinkler Rough-in4/20/20124/20/20124/20/2012 2:55:44 PMPDONE
Lonnie had concerns over the two beams blocking pendant sprinkler coverage in the "Great Room". I met the general contractor and showed him the obstruction charts in NFPA 13D. It appears that the best option is three addtional heads in the center beam pocket.
BLD12-00491 FIRE-Final Inspection4/19/20124/20/20124/20/2012 12:58:09 PMAFAIL
Provide annual inspection for the fire extinguisher, install doors and harware for verification, reverse door swing for the common restroom corridor per the approved plans, provide suite number.
FIR12-00168 INSP-Sprinkler Rough-in4/19/20124/20/20124/20/2012 11:21:27 AMAPASS
Sprinkler piping is ok to cover