Inspections for the day of: Monday, April 20, 2015.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDave Hannah
TitleBLD-COM/RES INSPECTOR
Phone #794-1967
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD13-03405 BLD-Conference4/17/20154/20/20154/21/2015 6:46:57 AMANR
This inspection is really for the PM with the original scheduled inspection but the system will not allow for an added item. Tower 4, East Elevation 4th and 5th Floors for Energy Code and Framing for Insulation cover. Phone #: ###-#### Inspection requested via web by Carl Benjamin
BLD15-01099 BLD-Final4/17/20154/20/20154/21/2015 6:45:11 AMPNR
Shelby Phone #: ###-#### needs fire finals first
BLD14-03018 BLD-Final4/20/20154/20/20154/21/2015 6:44:30 AMPFAIL
Scott Phone #: ###-#### pool cover not taged with astm and gates and locks not to code
BLD13-03405 BLD-Conference4/17/20154/20/20154/21/2015 6:43:00 AMPDEFR
Tower 3 East elevation Exterior Shear Nailing Inspection. Phone #: ###-#### Inspection requested via web by Carl Benjamin
BLD15-00353 BLD-Framing/Rough-in4/20/20154/20/20154/20/2015 1:55:06 PMPPASS
Curtis Phone #: ###-####
BLD15-00544 BLD-Wall Bracing4/20/20154/20/20154/20/2015 1:13:47 PMPNR
Shane Phone #: ###-####
BLD15-00544 BLD-Foundation4/20/20154/20/20154/20/2015 1:13:31 PMPPASS
BLD15-00405 BLD-Wall Bracing4/17/20154/20/20154/20/2015 9:02:52 AMAPASS
Dean Phone #: ###-####