ESC15-01089
| Aging Inspection | 4/20/2016 | 4/20/2016 | 4/20/2016 4:04:40 PM | | PASS |
|
|
Disturbed area for addition is stabilized. No sediment or other material leaving site. ESC permit finaled.
|
ESC15-01089
| DOC - Permit Finaled | 4/20/2016 | 4/20/2016 | 4/20/2016 4:04:02 PM | P | PASS |
|
|
|
ESC15-00857
| General Inspection | 4/20/2016 | 4/20/2016 | 4/20/2016 3:52:53 PM | | PASS |
|
|
No significant changes to site. Construction shall resume soon. Slopes that were hydroseeded are growing well. No new erosion or rills observed.
Note - ACHD, HOA, and developer addressing concerns on the stormwater pond that receives water from this development located on Arrow Villa & Winter Camp
|
ESC15-00667
| General Inspection | 4/20/2016 | 4/20/2016 | 4/20/2016 3:25:58 PM | | CANC |
|
|
Warm Springs by-pass has been completed and in use for several months. Permit is open while shoulders vegetate and disturbed area is stabile enough to remove temporary silt fence installations. No inspection conducted at this time. Permit shall remain open.
|
ESC16-00302
| Site Preparation | 4/20/2016 | 4/20/2016 | 4/20/2016 3:24:28 PM | P | PASS |
|
|
Subdivision BMPs installed. CBH sites in Dropzone sub are in compliance. Approved for construction.
|
ESC15-00922
| Aging Inspection | 4/20/2016 | 4/20/2016 | 4/20/2016 3:23:55 PM | | CANC |
|
|
rescheduled for site final
|
ESC15-00973
| Aging Inspection | 4/20/2016 | 4/20/2016 | 4/20/2016 1:05:17 PM | | PASS |
|
|
Patio home complete. Trailwinds sub in good conditions. All permits finaled, ESC conditions satisfied.
|
ESC15-00973
| DOC - Permit Finaled | 4/20/2016 | 4/20/2016 | 4/20/2016 1:04:19 PM | P | PASS |
|
|
|
ESC15-00826
| DOC - Permit Finaled | 4/20/2016 | 4/20/2016 | 4/20/2016 1:02:37 PM | P | PASS |
|
|
Home complete, landscaped and occupied. No ESC corrections needed to meet permit conditions. Permit finaled.
|
ESC16-00356
| BMP Violation | 4/20/2016 | 4/20/2016 | 4/20/2016 12:53:48 PM | P | FAIL |
|
|
Incomplete sweep up after foundation was poured. No concrete washout containment used.
Written CN posted: - sweep up Holden street at both site accesses. - clean up concrete waste - provide stabilzed construction area or leave broom on site for daily sweeping.
|
ESC15-00333
| Aging Inspection | 4/20/2016 | 4/20/2016 | 4/20/2016 12:40:23 PM | | PASS |
|
|
Home complete.
Need to finish landscaping on all recently and soon to be finished homes at Tianna Park and remove all temp BMPs.
|
ESC14-00928
| Random Inspection | 4/20/2016 | 4/20/2016 | 4/20/2016 10:52:01 AM | P | PASS |
|
|
Building frame is complete. Site perimeter is free of trackout, loose sediment, and discharges. No corrections needed. Crew in progress of working on the exterior
|
ESC16-00302
| Site Preparation | 4/19/2016 | 4/20/2016 | 4/20/2016 10:29:18 AM | A | CANC |
|
|
Tracy Phone #: ###-####
rescheduled for PM
|
ESC15-00938
| Site Preparation | 4/19/2016 | 4/20/2016 | 4/20/2016 10:28:20 AM | A | PASS |
|
|
Trevor Phone #: ###-####
Cell tower building project to start. BMPs include permit signage and clean/contained staging area. Flat area with adequate staging space. Relativly small earth disturbance.
Approved.
|
ESC16-00294
| Site Preparation | 4/19/2016 | 4/20/2016 | 4/20/2016 9:27:06 AM | A | PASS |
|
|
Robert Phone #: ###-####
Ready for construction. Staging and loading area will be through alley per Robert. Requested regular sweep up and trash containment. Two portable washouts for concrete are on site.
Permit sign posted.
|
ESC15-01080
| Aging Inspection | 4/20/2016 | 4/20/2016 | 4/20/2016 9:05:33 AM | | PASS |
|
|
Project complete. All permits finaled. No ESC corrections needed at site.
|
ESC15-01080
| DOC - Permit Finaled | 4/20/2016 | 4/20/2016 | 4/20/2016 9:05:02 AM | P | PASS |
|
|
|
ESC14-00432
| Site Preparation | 4/18/2016 | 4/20/2016 | 4/19/2016 10:06:34 AM | P | CANC |
|
|
data entry error
|