ELE16-04017
| Electrical Rough-In | 4/20/2017 | 4/20/2017 | 4/20/2017 2:37:25 PM | P | PASS |
|
|
L1 deck pour 5A rough-in Phone #: ###-#### Inspection requested via web by Debby Pierce Area noted rough in ok cover
|
ELE17-01112
| Electrical Rough-In | 4/20/2017 | 4/20/2017 | 4/20/2017 1:04:09 PM | P | PASS |
|
|
Underground Inspection Phone #: ###-#### Inspection requested via web by steve ragan From transformer to exterior on east side and interior from location on east side to central wall near elevator control room. Rough in ok cover
|
ELE17-01144
| Final | 4/19/2017 | 4/20/2017 | 4/20/2017 11:11:26 AM | A | PASS |
|
|
Inspect garage addition. No sheet rock, so lights and trim is installed and ready for final inspection. Phone #: ###-#### Inspection requested via web by Terry Scott Final ok
|
ELE17-01144
| Electrical Rough-In | 4/20/2017 | 4/20/2017 | 4/20/2017 10:50:37 AM | P | PASS |
|
|
Inspect garage addition. No sheet rock, so lights and trim is installed and ready for final inspection. Phone #: ###-#### Inspection requested via web by Terry Scott Garage Extension to front rough in ok
|
ELE16-03005
| Final | 4/20/2017 | 4/20/2017 | 4/20/2017 10:34:09 AM | A | PASS |
|
|
Final Inspection for the Level 13 restrooms at One Capital Center Contact Jon Novak Thank you Phone #: ###-#### Inspection requested via web by Cathy Duchek Existing bored holes in floor still need fire block installed. Final ok
|
ELE17-00037
| Electrical Rough-In | 4/19/2017 | 4/20/2017 | 4/20/2017 9:37:43 AM | A | PASS |
|
|
Rough-In Inspection for units 811 ; 813 Contact Dan Hutchinson Thank you. Phone #: ###-#### Inspection requested via web by Cathy Duchek Area noted rough in ok cover
|
ELE13-01291
| Electrical Rough-In | 4/20/2017 | 4/20/2017 | 4/20/2017 9:05:58 AM | A | PASS |
|
|
Call Tony Keen for concrete wall rough in at amphitheater in park area. Phone #: ###-#### Inspection requested via web by Tom Betty Level 3 of sitting area, tractor pad and planter underground to south of HQ rough in ok cover
|