ELE13-00718
| ELE-Aging Inspection | 4/20/2018 | 4/20/2018 | 4/23/2018 2:43:28 PM | | FAIL |
|
|
Waiting for contractor to schedule
|
ELE12-01429
| ELE-Aging Inspection | 4/20/2018 | 4/20/2018 | 4/23/2018 2:42:52 PM | | FAIL |
|
|
Waiting for contractor to schedule
|
ELE17-01337
| Electrical Rough-In | 4/19/2018 | 4/20/2018 | 4/20/2018 1:47:35 PM | P | PART |
|
|
Partial final guest rooms on LVL4. Ceiling rough-in 4 guest rooms LVL1. Phone #: ###-#### Inspection requested via web by Clint Tate Level 1 not ready, level 4 401 thru 434 including refer receptacles minus 428 ok for furniture, Level 5 refer receptacles ok.
|
ELE18-01507
| Rough-In Permanent Service | 4/19/2018 | 4/20/2018 | 4/20/2018 11:20:37 AM | A | PASS |
|
|
Vern Phone #: ###-#### Still need receptacles as per 210.52(G)(1). Still need lighting as per210.70(A)(2). Overhead service only p/s o/h n ok
|
ELE18-01509
| Electrical Rough-In | 4/19/2018 | 4/20/2018 | 4/20/2018 10:47:55 AM | A | PASS |
|
|
LED Exterior Phone #: ###-#### Inspection requested via web by Tim Dunlop parking lot light poles, wall packs on perimeter of building, andexterior entry cans all changing to LED. Listing on all confirmed. Rough in ok
|
ELE18-00495
| Final | 4/19/2018 | 4/20/2018 | 4/20/2018 10:22:58 AM | A | PASS |
|
|
code 4224 any ? call bill ###-#### Phone #: ###-#### Inspection requested via web by Bob Glenn Final ok
|
ELE18-01505
| Final | 4/19/2018 | 4/20/2018 | 4/20/2018 9:19:00 AM | A | PASS |
|
|
Warren Phone #: ###-#### (tile will be left open in the ceiling and anyone in the office can show you where it's at, call warren if needed) Final ok
|
ELE18-01505
| Electrical Rough-In | 4/20/2018 | 4/20/2018 | 4/20/2018 9:18:55 AM | P | PASS |
|
|
Warren Phone #: ###-#### (tile will be left open in the ceiling and anyone in the office can show you where it's at, call warren if needed) raceway to new office receptacles rough in ok cover
|