Inspections for the day of: Friday, April 20, 2018.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRock A. Hudson
TitleELE-INSPECTOR
Phone #794-6794
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE13-00718 ELE-Aging Inspection4/20/20184/20/20184/23/2018 2:43:28 PM FAIL
Waiting for contractor to schedule
ELE12-01429 ELE-Aging Inspection4/20/20184/20/20184/23/2018 2:42:52 PM FAIL
Waiting for contractor to schedule
ELE17-01337 Electrical Rough-In4/19/20184/20/20184/20/2018 1:47:35 PMPPART
Partial final guest rooms on LVL4. Ceiling rough-in 4 guest rooms LVL1. Phone #: ###-#### Inspection requested via web by Clint Tate
Level 1 not ready, level 4 401 thru 434 including refer receptacles minus 428 ok for furniture, Level 5 refer receptacles ok.
ELE18-01507 Rough-In Permanent Service4/19/20184/20/20184/20/2018 11:20:37 AMAPASS
Vern Phone #: ###-####
Still need receptacles as per 210.52(G)(1).
Still need lighting as per210.70(A)(2).
Overhead service only p/s o/h n ok
ELE18-01509 Electrical Rough-In4/19/20184/20/20184/20/2018 10:47:55 AMAPASS
LED Exterior Phone #: ###-#### Inspection requested via web by Tim Dunlop
parking lot light poles, wall packs on perimeter of building, andexterior entry cans all changing to LED. Listing on all confirmed. Rough in ok
ELE18-00495 Final4/19/20184/20/20184/20/2018 10:22:58 AMAPASS
code 4224 any ? call bill ###-#### Phone #: ###-#### Inspection requested via web by Bob Glenn
Final ok
ELE18-01505 Final4/19/20184/20/20184/20/2018 9:19:00 AMAPASS
Warren Phone #: ###-#### (tile will be left open in the ceiling and anyone in the office can show you where it's at, call warren if needed) Final ok
ELE18-01505 Electrical Rough-In4/20/20184/20/20184/20/2018 9:18:55 AMPPASS
Warren Phone #: ###-#### (tile will be left open in the ceiling and anyone in the office can show you where it's at, call warren if needed)
raceway to new office receptacles rough in ok cover