ELE17-04375
| Final | 4/20/2018 | 4/20/2018 | 4/20/2018 1:58:40 PM | P | PASS |
|
|
We Are All Ready Just Buttoning Up The Exterior Thanks Dave Phone #: ###-#### Inspection requested via web by jason shifflett final ok
|
ELE18-01516
| Temporary Service | 4/20/2018 | 4/20/2018 | 4/20/2018 1:09:47 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Bob Glenn t/s u/g n ok
|
ELE18-01322
| Electrical Rough-In | 4/19/2018 | 4/20/2018 | 4/20/2018 12:49:13 PM | P | PART |
|
|
Swimming Pool Bonding and Ground Work Cover Inspection Request... Phone #: ###-#### Inspection requested via web by JOHN MCCURDY NO EQ BOND. Bond wire was in trench with conduits. Not installed per 680.26B4 and 680.26B5. Undergrond for pool lights only ok to cover
|
ELE18-00284
| Final | 4/19/2018 | 4/20/2018 | 4/20/2018 12:14:53 PM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Eric Landberg final ok
|
MIS18-00137
| ELE-Conference | 4/20/2018 | 4/20/2018 | 4/20/2018 11:34:52 AM | A | DONE |
|
|
Demo only now. Will pull permits when job starts
|
ELE18-01006
| Electrical Rough-In | 4/19/2018 | 4/20/2018 | 4/20/2018 11:13:56 AM | A | PASS |
|
|
Kyle and crew will be there in the AM Phone #: ###-#### Inspection requested via web by BRS Permitting Listing only ok
|
ELE18-01502
| Conference | 4/19/2018 | 4/20/2018 | 4/20/2018 11:03:09 AM | A | DONE |
|
|
Doug Phone #: ###-#### T/S conference. Need to raise mast and support
|
ELE18-01503
| Conference | 4/20/2018 | 4/20/2018 | 4/20/2018 11:02:16 AM | A | DONE |
|
|
Doug Phone# ###-#### Still early in the project. Was told to reschedule conference when building was farther along.
|
ELE18-00623
| Final | 4/19/2018 | 4/20/2018 | 4/20/2018 9:30:17 AM | A | PASS |
|
|
Garage code 1001E Phone #: ###-#### Inspection requested via web by Alan Lusk final ok
|
ELE18-01512
| Electrical Rough-In | 4/19/2018 | 4/20/2018 | 4/20/2018 8:50:44 AM | A | PASS |
|
|
Underground and bonding for swimming pool Phone #: ###-#### Inspection requested via web by Lars Johnson Shallow conduit from house to pool will have concrete on top.(Cover Switch) Underground ok Coner bond ok
|
ELE18-01503
| Conference | 4/19/2018 | 4/20/2018 | 4/20/2018 7:39:28 AM | A | CANC |
|
|
Doug Phone #: ###-#### called in twice
|
ELE18-01322
| Electrical Rough-In | 4/19/2018 | 4/20/2018 | 4/19/2018 10:13:07 PM | A | CANC |
|
|
This is for Groundwork Cover and Bonding for the Swimming Pool... Phone #: ###-#### >> Inspection requested via web by JOHN MCCURDY Inspection cancelled from web by: JOHN MCCURDY
|