Inspections for the day of: Friday, April 20, 2018.
Number of inspections: 6
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR17-00692 INSP-Final Inspection4/20/20184/20/20184/20/2018 2:03:39 PMPCANC
Phone #: 2088301311 >> Inspection requested via mobile web by Nathan Price
NAF18-00046 INSP-Final4/19/20184/20/20184/20/2018 1:34:17 PMAFAIL
Provide ADA compliant single action door hardware on the two west facing doors and remove the thumb-turn deadbolts on these two doors. Provide a 2a,10bc fire exxtiguisher with a current inspection tag from a certified company mounted i a normal path of traffic. Mount no higher than 5' or lower than 4". Repair the non-functional emergency light. Provide all city approved plans and small documents. If additional corrections are required, as noted on the city approved plans, they will need to be corrected prior to a final sign off.


Call prior to going Phone #: 2085914283 >> Inspection requested via mobile web by DAVE Christensen
BLD18-01264 FIRE-Final Inspection4/19/20184/20/20184/20/2018 10:37:01 AMAPASS
Life safety passed
NAF18-00044 INSP-Final4/20/20184/20/20184/20/2018 10:36:38 AMPDONE
Life safety passed
FIR17-00259 INSP-Final Inspection4/19/20184/20/20184/20/2018 9:41:58 AMAFAIL
See the city approved plans for corrections needed. No actual testing performed.

Rafe Phone #: ###-####
BLD17-01277 FIRE-Final Inspection4/17/20184/20/20184/20/2018 9:28:56 AMAPART
The Point of Sale area life safety is passed. There is a issue with exiting, as per plans, from this area. The two exit signs have not been installed but if they end up being installed one of the two doors has a manual roll down security gate in front of it. Also as per the previous inspection the wall that was shown to be demolished in the Service Bay was actually rebuilt with framed openings and newly added exit signs. This does not match plans. Other corrections are adding sprinkler protection in the east office area and removing all of the (5 doors) keyed dead bolts. An exit discharge needs to be repaired at the east exit door and one added at the south exit door.

Julio Phone #: ###-####