FIR16-00586
| INSP-Sprinkler Rough-in/Hydro | 4/18/2018 | 4/20/2018 | 4/20/2018 3:50:27 PM | P | PART |
|
|
Hydrostatic test witnessed for southeast wet standpipe, levels 2, 3 and 5, no pressure observed at contractor supplied gauges. Level 4 still needs to have hydro completed.
|
BLD17-03533
| BLD-Conference | 4/20/2018 | 4/20/2018 | 4/20/2018 3:28:53 PM | P | DONE |
|
|
Fire conference complete.
|
BLD18-00001
| FIRE-Final Inspection | 4/20/2018 | 4/20/2018 | 4/20/2018 1:37:12 PM | P | PASS |
|
|
Fire sprinkler inspection complete, no fire alarm modifications, fire extinguisher is in place with a current inspection tag. Final life fire safety inspection for area of work complete.
|
FIR18-00182
| INSP-Final Inspection | 4/20/2018 | 4/20/2018 | 4/20/2018 1:36:23 PM | P | PASS |
|
|
Final fire sprinkler inspection for area of work complete.
|
FIR18-00139
| INSP-Sprinkler Rough-in | 4/20/2018 | 4/20/2018 | 4/20/2018 1:11:57 PM | P | PART |
|
|
Rough to cover inspection for change of direction, PIV and piping between change of direction and PIV complete, approved for cover. Piping after PIV to be installed at a later date.
|
FIR18-00061
| INSP-Final Inspection | 4/19/2018 | 4/20/2018 | 4/20/2018 10:52:45 AM | P | PASS |
|
|
Final fire alarm inspection for area of work complete.
|
FIR18-00274
| INSP-Final Inspection | 4/19/2018 | 4/20/2018 | 4/20/2018 9:12:26 AM | A | PASS |
|
|
Final fire alarm inspection for scope of work complete.
|
FIR18-00171
| INSP-Final Inspection | 4/17/2018 | 4/20/2018 | 4/20/2018 8:33:16 AM | A | FAIL |
|
|
Final inspection will not be performed until completion of 24 hour air test.
|
FIR18-00173
| INSP-Final Inspection | 4/17/2018 | 4/20/2018 | 4/20/2018 8:33:00 AM | A | FAIL |
|
|
Final inspection will not be performed until completion of 24 hour air test.
|