Inspections for the day of: Monday, April 20, 2020.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC14-00788 Aging Inspection4/20/20204/20/20204/21/2020 4:02:01 PM PASS
ESC18-00979 General Inspection4/20/20204/20/20204/21/2020 3:52:26 PM CANC
ESC16-01560 General Inspection4/20/20204/20/20204/20/2020 7:00:36 PM PASS
ESC18-00778 Aging Inspection4/20/20204/20/20204/20/2020 7:00:20 PM CANC
ESC19-00371 General Inspection4/20/20204/20/20204/20/2020 7:00:06 PMPPART
check for any dust issues

Report of no water trucks onsite.


Two water trucks parked on site (one for L2, one for Central Paving), some areas of dust generation. No consistent plumes or wind blown dust.

Request to have water trucks cycle over haul roads and dust areas at least once every 1-1.5 hours.
ESC19-01084 General Inspection4/20/20204/20/20204/20/2020 6:57:42 PMPPEND
confirm dewatering plan installation per plan

Corrective actions and payment of fines for violations have been completed. Site has an approved dewatering plan.

Site footprint does not allow for the same # of ponds drawn on site plan. Rest of plan is implemented per plan.

Background pond water is 6 NTU, limit of discharge should be 56 NTU

Was onsite for water to begin discharging into pond, with turbidity readings between 65-80. Water was beginning to clear up, going to allow dewatering through night and will check in the morning and modify as needed to get dewatering discharge below 56 NTU.
ESC19-00221 BMP Violation4/17/20204/20/20204/20/2020 1:54:34 PMADONE
have fine added to permit for dumped washout

Washout was reportedly committed by Knife River during sidewalk installation for phases 8-10. Investigation in progress
ESC18-00177 General Inspection4/20/20204/20/20204/20/2020 1:53:18 PM CANC
ESC19-01084 BMP Violation4/17/20204/20/20204/20/2020 12:37:49 PMADONE
NOV sent to project RP and excavation/dewatering foreman

Fees added to site for violations:

$78.75 ESC special site fee: no approved dewatering plan
$78.75 ESC special site fee: prohibited dirty discharge to public surface water
ESC17-01088 General Inspection4/20/20204/20/20204/20/2020 10:13:35 AM CANC
ESC18-00967 Aging Inspection4/20/20204/20/20204/20/2020 8:42:44 AM CANC
rescheduled for site final