Inspections for the day of: Wednesday, April 21, 2004.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRick Jackson
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR04-00036 FIR-Aging Inspection4/21/20044/21/20044/21/2004 12:00:00 AM PART
Debest will schedule for inspection 4/21/2004 9:26:33 AM
BLD03-02543 FIRE-Final Inspection4/20/20044/21/20044/21/2004 12:00:00 AMAPASS
CARL; Phone #: ###-#### Internet Inspection Request from: Darla Downs Will have smoke seal/latch on door in rated wall and sign above main exit for structural inspector 4/21/2004 12:20:48 PM
BLD03-02560 FIRE-Final Inspection4/20/20044/21/20044/21/2004 12:00:00 AMPFAIL
###-#### rick dennis repair emergency light in and add exit signs for second exit in parks area; remove single station smoke detectors; extinguishers needed in both parks and police areas 4/21/2004 3:23:20 PM
FIR03-00598 INSP-Sprinkler Rough-in4/21/20044/21/20044/21/2004 12:00:00 AMPNR
Jeff; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes Received call from Jeff and all of the heads aren't installed in the canopy 4/21/2004 1:29:56 PM
FIR04-00027 INSP-Conference4/21/20044/21/20044/21/2004 12:00:00 AMPPART
Shilo just removed some pipe with this permit prior to sprinkler work awarded. Another sprinkler contractor has been contracted to finish the project. Other modifications were done. If we need to meet on site either call or respond to this and I will set something up with you for next week as I'm out of town all this week. Thank you; Phone #: ###-#### Internet Inspection Request from: Trent Bice Please schedule an inspection so the permit can be closed out and verify scope of work 4/21/2004 12:17:39 PM
FIR03-00468 INSP-Sprinkler Rough-in/Hydro4/21/20044/21/20044/21/2004 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 4/21/2004 at 10:40:03 AM. Contact: ###-####. Okay to cover; this is a phased project and the current waiting room has two heads and will be overspaced when it is changed to storage room (shown with three heads on plans for OH); minor changes made due to mechanical duct work 4/21/2004 2:06:59 PM
BLD04-00167 FIRE-Final Inspection4/21/20044/21/20044/21/2004 12:00:00 AMPPASS
Dave; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
FIR03-00598 INSP-Sprinkler Rough-in4/21/20044/21/20044/21/2004 12:00:00 AMPPART
Met with Jeff of TVFP and per Dave Miller the dry sidewalls in the front canopy have been approved with two additional heads; okay to cover the interior walls at piping to canopy 4/21/2004 2:33:03 PM