ELE06-00240
| ELE-Aging Inspection | 4/21/2006 | 4/21/2006 | 4/28/2006 12:21:25 PM | | FAIL |
|
|
corr. called 600.5(C)(3)&410.15(B) will meet contractor 05-01-06 9:00 am
|
ELE05-04208
| ELE-Aging Inspection | 4/21/2006 | 4/21/2006 | 4/27/2006 3:10:41 PM | | PART |
|
|
wsuc could not locate new sign not installed yet ?
|
ELE06-01264
| Final | 4/20/2006 | 4/21/2006 | 4/21/2006 4:18:26 PM | P | PASS |
|
|
I need the 4 new condensing units inspected. Located behind the apartments. Danny ###-#### Thanks; Phone #: ###-#### Internet Inspection Request from: danny pugil
|
ELE06-01387
| Rough-In Permanent Service | 4/21/2006 | 4/21/2006 | 4/21/2006 3:47:26 PM | P | PASS |
|
|
###-#### partial r/i for under floor , p/s o/h rec. ok
|
ELE06-01344
| Final | 4/19/2006 | 4/21/2006 | 4/21/2006 2:59:52 PM | P | PASS |
|
|
need final inspection on new 200 amp service. new circuit for a/c & furnace. thank you.; Phone #: ###-#### Internet Inspection Request from: BRIAN KEITH ok
|
ELE06-01344
| Permanent Service | 4/21/2006 | 4/21/2006 | 4/21/2006 2:59:35 PM | P | PASS |
|
|
NEED FINAL INSPECTION ON NEW 200 AMP SERVICE. ADD CIRCUIT FOR A/C & FURNACE. THANK YOU.; Phone #: ###-#### x Internet Inspection Request from: BRIAN KEITH r/i ok p/s u/g rec. ok
|
ELE06-00407
| Final | 4/21/2006 | 4/21/2006 | 4/21/2006 2:45:44 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 4/21/2006 at 9:25:45 AM. Contact: ###-####. ok card signed
|
ELE06-01340
| Permanent Service | 4/21/2006 | 4/21/2006 | 4/21/2006 2:17:02 PM | P | FAIL |
|
|
Phone #: ###-#### Internet Inspection Request from: Justin Metcalf corr. called 250.52,104 (A)(1) grd or bond water, T310.15(B)(2)a derate wires in 2" at 50%,250.64(E) use listed conn. for GEC at p/s, 300.10 bond bushing for RE washers, 250.66 GEC and bonding shall be #4 copper, 230.24 clearence over patio cover, 408.4 panel schedule, 220.55 table 40 amp circuit and wire for range 310.8(D) sunkight resistant wire at whetherhead
|
ELE06-01364
| Electrical Rough-In | 4/20/2006 | 4/21/2006 | 4/21/2006 12:36:33 PM | P | FAIL |
|
|
###-#### - rod corr. met electrician, 314.16 box fill, 210.52(A&B) outlet spacing din rm also shall be on small appliance branch circuit, 314.17 shall replace 3 gang cutin box with broken out clamps
|
ELE06-01368
| Electrical Rough-In | 4/20/2006 | 4/21/2006 | 4/21/2006 11:06:52 AM | A | FAIL |
|
|
###-#### - vivian Note: shop corr. called 300.4 nail plates, 314.17 staple romex within 8", 250.32 needs GEC to rebar at shop, needs uncover u/g covered before inspection, and update permit for 2rms, p/s
|
ELE06-01345
| Rough-In Permanent Service | 4/20/2006 | 4/21/2006 | 4/21/2006 11:04:55 AM | A | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung r/i ok p/s u/g new ok
|
ELE06-01385
| Permanent Service | 4/21/2006 | 4/21/2006 | 4/21/2006 10:47:30 AM | P | CANC |
|
|
###-#### contractor called and canceled
|
ELE06-01372
| Final | 4/20/2006 | 4/21/2006 | 4/21/2006 10:13:41 AM | A | PASS |
|
|
|
ELE06-01372
| Electrical Rough-In | 4/20/2006 | 4/21/2006 | 4/21/2006 10:13:28 AM | A | PASS |
|
|
allen ###-####
|
ELE06-00422
| Electrical Rough-In | 4/20/2006 | 4/21/2006 | 4/21/2006 9:39:03 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 4/20/2006 at 11:32:33 AM. Contact: ###-####. wiring in 3 counter walls, border tiles in north half of 2nd floor ok only
|
ELE06-00628
| Rough-In Permanent Service | 4/21/2006 | 4/21/2006 | 4/21/2006 8:38:49 AM | A | FAIL |
|
|
Phone #: ###-#### Internet Inspection Request from: Barbara Szurgot corr. called 300.4 needs nail plates, 334.30,314.17 staple romex within 8" of boxes,250.70 use acorn or listed pipe grd clamp for GEC at rebar loose, 250.64(C) shall not splice GEC
|