FIR08-00018
| INSP-Final Inspection | 4/17/2009 | 4/21/2009 | 4/21/2009 6:37:26 PM | A | PART |
|
|
10th floor correction finished, no access to 4th floor, 16th floor flow switch retest passed. 9th floor flow switch restest failed, 3rd floor trip test delivered water to the inspectors test at 90 seconds-need verification of system size to determine timing requirements per NFPA 13.
|
FIR08-00234
| INSP-Alarm Testing | 4/20/2009 | 4/21/2009 | 4/21/2009 6:26:01 PM | P | PART |
|
|
Contact Rafe. Phone #: ###-#### Internet Inspection Request from: Shelli Daylong
|
BLD06-02303
| FIRE-Final Inspection | 4/20/2009 | 4/21/2009 | 4/21/2009 6:24:13 PM | P | NR |
|
|
brad Phone #: ###-####
|
FIR09-00126
| INSP-Sprinkler Rough-in | 4/20/2009 | 4/21/2009 | 4/21/2009 6:21:31 PM | A | PART |
|
|
See annotations on stamped plans for locations approved for cover at the drop ceilings marked with today's date.
|
FIR08-00768
| INSP-Final Inspection | 4/20/2009 | 4/21/2009 | 4/21/2009 6:20:16 PM | A | PASS |
|
|
Fire alarm system modifications passed field testing, permit finaled.
|
FIR08-00737
| INSP-Final Inspection | 4/20/2009 | 4/21/2009 | 4/21/2009 6:19:28 PM | A | PART |
|
|
New dry system trip testing completed satisfactory, still missing two upright heads at the generator room.
|
FIR09-00186
| INSP-Sprinkler Rough-in/Hydro | 4/20/2009 | 4/21/2009 | 4/21/2009 6:17:38 PM | A | PART |
|
|
Underground fire supply line okayed for cover.
|