FIR10-00497
| INSP-Final Inspection | 4/21/2011 | 4/21/2011 | 4/21/2011 3:45:20 PM | P | PART |
|
|
UG fire supply line hydrostatic test completed 3/8 by T. Frost- ref. project related activity notes under FIR10-00569.
|
BLD10-02982
| FIRE-Final Inspection | 4/21/2011 | 4/21/2011 | 4/21/2011 3:42:01 PM | P | PASS |
|
|
Corrections completed- Inspection passed. Fire life safety finaled.
|
BLD10-02349
| FIRE-Final Inspection | 4/21/2011 | 4/21/2011 | 4/21/2011 3:40:54 PM | P | FAIL |
|
|
Items for final include relocate fire extinguisher along a normal path of travel in compliance with fire code review notes, provide approved hardware at the south exit/remove deadbolt, handrails are not yet installed.
|
BLD11-00594
| FIRE-Final Inspection | 4/21/2011 | 4/21/2011 | 4/21/2011 3:36:42 PM | P | PASS |
|
|
Fire life safety inspection passed. Tenant to repair one existing EM light as discussed.
|
FIR10-00540
| INSP-Sprinkler Rough-in/Hydro | 4/21/2011 | 4/21/2011 | 4/21/2011 3:34:59 PM | A | PART |
|
|
|
FIR11-00170
| INSP-Sprinkler Rough-in | 4/21/2011 | 4/21/2011 | 4/21/2011 3:32:57 PM | A | PART |
|
|
Rough-in at the first floor only per annotations okay to cover.
|