Inspections for the day of: Thursday, April 21, 2011.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC11-00157 Site Preparation4/21/20114/21/20114/21/2011 4:07:20 PM NR
ESC11-00137 Site Preparation4/15/20114/21/20114/21/2011 3:08:22 PMAPASS
ESC11-00199 Site Preparation4/20/20114/21/20114/21/2011 3:08:06 PMAPASS
ESC11-00221 Site Preparation4/21/20114/21/20114/21/2011 11:57:29 AM NR
ESC11-00175 Site Preparation4/21/20114/21/20114/21/2011 11:30:45 AM NR
ESC11-00151 General Inspection4/21/20114/21/20114/21/2011 11:13:49 AM FAIL
Verbal to RP & Project Supervisor (Wes Smith):
1. Post ESC sign on the chain link fence surrounding the project area.
2. Protect the storm drain to the west and east of project area. (2 drains total)
3. Clean up all hardsurfaces within and surrounding the project area of all sediment and debris.
4. Provide a sediment barrier surrounding the stock pile of base rock on the westside of the project area. Will alow them to cover with visquen or relocate stockpile to an area that will not allow sediment dispositons to the storm drains.
Will re-inspect on 4/22/2011PM.
ESC11-00101 Site Preparation4/21/20114/21/20114/21/2011 10:17:01 AM NR