Inspections for the day of: Monday, April 21, 2014.
Number of inspections: 5
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR14-00075 INSP-Final Inspection4/18/20144/21/20144/21/2014 4:06:47 PMPPART
Verified additional smoke detection per noted revisions. Okay to final when documents enclosure is provided. Will accept as-builts at final.
FIR14-00100 INSP-Final Inspection4/21/20144/21/20144/21/2014 3:06:51 PMPPASS
Fire sprinkler work passed final walkthrough.
BLD13-02584 FIRE-Final Inspection4/21/20144/21/20144/21/2014 1:47:01 PMPPASS
Life safety final approved.
BLD13-02584 FIRE-Final Inspection4/21/20144/21/20144/21/2014 1:46:18 PMPPASS
Previous correction items completed and verified.
FIR13-00713 INSP-Sprinkler Rough-in/Hydro4/18/20144/21/20144/21/2014 11:35:35 AMAPART
Completed hydrostatic testing for both buildings floors 1, 2 and 3. Hydro at the north building 2nd floor failed due to pressure loss at the guage and visible leakage in unit 201. Also noted visible leakage at both buidling riser backflow manifolds- N. bldg upstream of the DCVA , S. bld at the #2 DCVA shutoff. Remainder of floor levels passed OH hydro.