Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE13-00774 Final4/21/20154/21/20154/21/2015 3:11:09 PMPPASS
UL listing and disconnecting means confirmed. Final ok
ELE15-00725 Final4/21/20154/21/20154/21/2015 2:46:56 PMPNR
Jay Phone #: ###-#### Lights need wired, close junction box in back corner above grid, finish ansel system for outlet test.
ELE15-00856 Final4/21/20154/21/20154/21/2015 2:05:54 PMPPASS
Phone #: ###-#### Inspection requested via web by John VanZandt Final ok
ELE15-01094 Electrical Rough-In4/21/20154/21/20154/21/2015 1:34:43 PMPPASS
Builder will be there. Walk on stone path to rear entry. Thank you Phone #: ###-#### Inspection requested via web by Eric Brown Master bed and bath rough in ok cover
ELE15-01035 Rough-In Permanent Service4/21/20154/21/20154/21/2015 1:18:19 PMPPASS
Cal Phone #: ###-#### Inspection requested via web by cal crosby Rough in ok cover p/s u/g n ok
ELE15-01068 Temporary Service4/21/20154/21/20154/21/2015 12:43:16 PMPPASS
Phone #: ###-#### Inspection requested via web by kendall bender t/s u/g n ok
ELE15-01063 Final4/21/20154/21/20154/21/2015 11:55:07 AMPFAIL
Solar Components Listing and inpection

Hey Guy''s -

Were finally back on track with this project. It started a couples months ago, but we couldn''t finish it before the customer left to Mexico for a month.
My guys will be there to finish the second half of the array, with panels and inverters available for listing inspection on the ground. I''ll be there to install the knife switch and get the home run from the array to the sub panel installed. Phone #: ###-#### Inspection requested via web by Ryan King Although not part of this contractors scope of work life safety issues were noticed.
BCC 4-05-32 Code violations not to be retained. 110.3 Electrical products shall be used as to its listing. 230.2-
Circuits from 1 building shall not enter another structure with seperate service. well circuit shall originate form main house.
LTFC NEC 356 shall be secured and fastened in place. not approved for overhead span. 230.22 over head conductors.
Individual conductors shall be in a cable assembly or conduit.
680.21- Pool motors and equipment shall have GFCI protection.
ELE15-01063 Electrical Rough-In4/17/20154/21/20154/21/2015 11:23:48 AMAPASS
Solar Components Listing and inpection

Hey Guy''s -

Were finally back on track with this project. It started a couples months ago, but we couldn''t finish it before the customer left to Mexico for a month.
My guys will be there to finish the second half of the array, with panels and inverters available for listing inspection on the ground. I''ll be there to install the knife switch and get the home run from the array to the sub panel installed. Phone #: ###-#### Inspection requested via web by Ryan King Components all have listing approved for installation
ELE15-01002 Electrical Rough-In4/20/20154/21/20154/21/2015 10:20:55 AMAPASS
Please call Troy Hughes 30 mins. prior to arrival. Phone #: ###-#### Inspection requested via web by MIKE HAGERTY Break room walls rough in ok cover
ELE15-00633 Final4/17/20154/21/20154/21/2015 9:37:22 AMAPART
Den Phone #: ###-#### Temp all ok Neede to check furniture for final. Temp occuancy ok
ELE15-01074 Final4/20/20154/21/20154/21/2015 9:09:04 AMAPASS
Installed and wired new dedicated 15 amp 120 volt circuit to a new twist lock receptacle located on the wall to the left of the panel labeled "House", fed from circuit breaker #25. The Starbucks shift manager will give you access to the room on the west side of the building where the panel is located. Phone #: ###-#### Inspection requested via web by Dan Mitchell Final ok
ELE15-01074 Electrical Rough-In4/20/20154/21/20154/21/2015 9:07:36 AMAPASS
Installed and wired new dedicated 15 amp 120 volt circuit to a new twist lock receptacle located on the wall to the left of the panel labeled "House", fed from circuit breaker #25. The Starbucks shift manager will give you access to the room on the west side of the building where the panel is located. Phone #: ###-#### Inspection requested via web by Dan Mitchell Rough in ok
ELE15-00675 Final4/21/20154/21/20154/21/2015 8:38:37 AMAPASS
James is the on site contact at ###-#### Phone #: ###-#### Inspection requested via web by Tracy Robertson Final ok
ELE13-00835 ELE-Aging Inspection4/21/20154/21/20154/21/2015 7:19:01 AM CANC
too busy
ELE13-00542 ELE-Aging Inspection4/21/20154/21/20154/21/2015 7:18:10 AM CANC
too busy