Inspections for the day of: Thursday, April 21, 2016.
Number of inspections: 5
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD15-02530 FIRE-Final Inspection4/21/20164/21/20164/21/2016 3:04:57 PMPFAIL
No small documents on site so Bob and I did a quick walk through. I noted missing sticker and indicator at the office exit. Opticons at the two gates will need to be tested by the fire dept prior to a sign off.
FIR16-00230 INSP-Final Inspection4/21/20164/21/20164/21/2016 3:02:37 PMPPASS
Permit finaled
BLD16-00804 FIRE-Final Inspection4/20/20164/21/20164/21/2016 12:34:52 PMAPASS
Life safety passed. Single action hardware on the southwest door to be installed prior to a building inspection.
FIR16-00183 INSP-Supply line flush4/20/20164/21/20164/21/2016 10:15:47 AMAPASS
Underground supply line flush passed
FIR15-00907 INSP-Conference4/20/20164/21/20164/21/2016 10:14:49 AMADONE
Air test started at 9:30. See pressure marked on guage.