Inspections for the day of: Tuesday, April 21, 2020.
Number of inspections: 4
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD20-00388 FIRE-Final Inspection4/21/20204/21/20204/21/2020 12:21:54 PMPPASS
Life safety passed. Alarm system repaired.

Robert Phone #: ###-####
FIR20-00160 INSP-Sprinkler Rough-in/Hydro4/20/20204/21/20204/21/2020 12:06:20 PMAPASS
5' stub out is ok for cover.

Phone #: ###-#### Inspection requested via web by Brad Bettencourt
FIR20-00105 INSP-Final Inspection4/20/20204/21/20204/21/2020 9:39:04 AMAFAIL
Actually went to the project site twice today. The first trip the descripters from the device to the panel did not match. Low air came in as an alarm and rang the bell. Came back the second time and the monitoring company descriptors do not match. Will need to reschedule for tomorrow and a re-inspection fee has been applied. Contact is Davis. Phone #: ###-#### Inspection requested via web by Morgan Ahten
BLD19-04518 FIRE-Final Inspection4/20/20204/21/20204/21/2020 9:29:32 AMACANC
Final Fire Life Safety Phase 1 after Fire Alarm Inspection at 7am Phone #: ###-#### >> Inspection requested via web by Markus Schlegel Inspection cancelled from web by: Markus Schlegel