ELE97-00441
| INSP - Final | 4/21/1997 | 4/22/1997 | 4/22/1997 12:00:00 AM | A | NH |
|
|
04/22/97 403 - LEFT CARD...MB
|
ELE97-00815
| INSP - Permanent service | 4/22/1997 | 4/22/1997 | 4/22/1997 12:00:00 AM | A | PASS |
|
|
INSPECTED DAY OF REQUEST...MB
|
ELE97-00815
| INSP - Ground work | 4/21/1997 | 4/22/1997 | 4/22/1997 12:00:00 AM | A | NR |
|
|
04/21/97 403 - GROUNDING ELECTRODE CONDUCTOR INSTALLATION (UFER) NOT COM
|
ELE97-01060
| INSP - Electrical Rough-In | 4/21/1997 | 4/22/1997 | 4/22/1997 12:00:00 AM | A | PASS |
|
|
04/21/97 403 - UNDER SLAB ROUGH-IN. AS EARLY AS YOU CAN SCHEDULE PER REQ ELECTRIC.
|
ELE97-01208
| INSP - Electrical Rough-In | 4/21/1997 | 4/22/1997 | 4/22/1997 12:00:00 AM | A | PASS |
|
|
04/21/97 403 - WALL IN BOILER ROOM O.K. TO COVER...MB
|
ELE97-01241
| INSP - Permanent service | 4/21/1997 | 4/22/1997 | 4/22/1997 12:00:00 AM | A | PASS |
|
|
04/22/97 403 - service and wiring a pump???/pe CORRECTIONS COMPLETED...AS PER JSCHMER.
|
ELE97-01242
| INSP - Electrical Rough-In | 4/22/1997 | 4/22/1997 | 4/22/1997 12:00:00 AM | P | PASS |
|
|
04/22/97 403 - re-inspection CORRECTIONS COMPLETED...MB ì
|
ELE97-01257
| INSP - Ele Rough-In/Perm Svc | 4/22/1997 | 4/22/1997 | 4/22/1997 12:00:00 AM | P | PASS |
|
|
04/22/97 403 - LEFT CORRECTION FOR REMOVAL OF S.E.R. CABLE CONNECTED TO POWER POLE, USED FOR EXTENSION TO CONSTRUCTION OUTLETS LAYING ACROSS DRI
|
ELE97-01258
| INSP - Electrical Rough-In | 4/22/1997 | 4/22/1997 | 4/22/1997 12:00:00 AM | P | PART |
|
|
04/22/97 403 - on a couple rooms BASEMENT REMODEL (2 ROOMS)...MB
|
ELE97-00900
| INSP - Final | 4/22/1997 | 4/22/1997 | 4/22/1997 12:00:00 AM | P | PASS |
|
|
04/22/97 403 -
|
ELE96-03840
| INSP - Electrical Rough-In | 4/22/1997 | 4/22/1997 | 4/22/1997 12:00:00 AM | P | PART |
|
|
04/22/97 403 - NORTH AND WEST WALLS, 1 ST. FLOOR...MB
|