PLM02-01059
| Plumbing Rough-in | 4/19/2002 | 4/22/2002 | 4/22/2002 12:00:00 AM | A | PASS |
|
|
###-####
|
PLM02-00923
| Plumbing Rough-in | 4/19/2002 | 4/22/2002 | 4/22/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 04/19/2002 at 15:18:21. Contact: ###-####. waste test failed 4/22/2002 10:06:40 AM
|
PLM02-00984
| Plumbing Rough-in | 4/21/2002 | 4/22/2002 | 4/22/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 04/21/2002 at 19:04:24. Contact: ###-####.
|
PLM02-01061
| Sprinkler (Final) | 4/22/2002 | 4/22/2002 | 4/22/2002 12:00:00 AM | A | PART |
|
|
Scheduled by Inspector: 330 On 4/22/2002 8:17:11 AM talked to lumber about exposing connections, testing and dcva requirements 4/22/2002 1:32:56 PM
|
PLM02-01048
| Sprinkler (Final) | 4/19/2002 | 4/22/2002 | 4/22/2002 12:00:00 AM | A | FAIL |
|
|
use 160 psi at tie in, needs pvb tested 4/22/2002 10:16:03 AM
|
PLM02-00879
| Water and/or Sewer | 4/19/2002 | 4/22/2002 | 4/22/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 04/19/2002 at 12:54:50. Contact: ###-####. this was done friday 4/22/2002 8:41:01 AM
|
PLM02-01058
| Plumbing Rough-in | 4/19/2002 | 4/22/2002 | 4/22/2002 12:00:00 AM | P | PASS |
|
|
###-####
|
PLM02-01029
| Plumbing Rough-in | 4/22/2002 | 4/22/2002 | 4/22/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 04/22/2002 at 08:30:10. Contact: ###-####.
|
PLM02-00697
| Plumbing Rough-in | 4/22/2002 | 4/22/2002 | 4/22/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 04/22/2002 at 08:30:53. Contact: ###-####.
|
PLM02-01065
| Water and/or Sewer | 4/22/2002 | 4/22/2002 | 4/22/2002 12:00:00 AM | P | PASS |
|
|
###-#### greg will bed sewer and water in clean fill 4/22/2002 2:36:15 PM
|
PLM02-01067
| Water and/or Sewer | 4/22/2002 | 4/22/2002 | 4/22/2002 12:00:00 AM | P | PART |
|
|
bob- ###-#### -swr & water s/w ok needs an easement for the rerout of the sewer for 1725 rossi 4/22/2002 3:12:36 PM
|
PLM02-01068
| Water and/or Sewer | 4/22/2002 | 4/22/2002 | 4/22/2002 12:00:00 AM | P | PASS |
|
|
john ###-####
|
PLM02-01048
| Sprinkler (Final) | 4/22/2002 | 4/22/2002 | 4/22/2002 12:00:00 AM | P | PART |
|
|
Scheduled by Inspector: 330 On 4/22/2002 10:16:16 AM tie in ok, needs testing 4/22/2002 3:48:45 PM
|
PLM02-01071
| Final | 4/22/2002 | 4/22/2002 | 4/22/2002 12:00:00 AM | P | PART |
|
|
###-#### no floor drainage for the r.p. install over the hub drain or provide a drain for it 4/22/2002 2:11:12 PM
|
PLM02-01053
| Plumbing Rough-in | 4/22/2002 | 4/22/2002 | 4/22/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 04/22/2002 at 10:20:53. Contact: ###-####. g/w- r/i ok 4/22/2002 2:20:23 PM
|
PLM02-01057
| Plumbing Rough-in | 4/22/2002 | 4/22/2002 | 4/22/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 330 On 4/22/2002 1:41:44 PM
|