Inspections for the day of: Monday, April 22, 2002.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorSteven Webb
Title 
Phone #794-9491
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD02-00654 BLD-Footing4/22/20024/22/20024/22/2002 12:00:00 AMAPART
Scheduled by Inspector: 420 On 4/22/2002 8:04:47 AM Footing on basement part only is wip--80 % ready at time of inspection. 4/22/2002 10:39:34 AM
BLD02-00186 BLD-Energy code compliance4/19/20024/22/20024/22/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 04/19/2002 at 10:29:06. Contact: .
BLD02-00287 BLD-Wall cover4/19/20024/22/20024/22/2002 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 04/19/2002 at 10:45:17. Contact: ###-####.
BLD02-00283 BLD-Framing/Rough-in4/19/20024/22/20024/22/2002 12:00:00 AMAFAIL
###-#### c/n--prior c/notice items not completed-ok to insulate only. 4/22/2002 11:24:05 AM
MEC02-01003 Rough-in4/19/20024/22/20024/22/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 04/19/2002 at 12:53:07. Contact: ###-####. Fireplace 4/22/2002 10:39:52 AM
BLD01-03119 BLD-Framing/Rough-in4/19/20024/22/20024/22/2002 12:00:00 AMAPART
###-#### shear panel SHEAR--ok to cover exterior except rear at great room--c/n posted. 4/22/2002 10:27:33 AM
BLD02-00654 BLD-Footing4/22/20024/22/20024/22/2002 12:00:00 AMPCANC
ft jim -###-#### Inspection performed in a.m. 4/22/2002 8:05:26 AM
BLD02-00229 BLD-Wall cover4/19/20024/22/20024/22/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 04/19/2002 at 16:26:34. Contact: ###-####. Shear-ok to side 4/22/2002 2:45:34 PM
BLD02-00390 BLD-Framing/Rough-in4/19/20024/22/20024/22/2002 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 04/19/2002 at 16:27:56. Contact: ###-####. c/n posted-ok to insulate. 4/22/2002 3:38:36 PM
BLD02-00548 BLD-Framing/Rough-in4/22/20024/22/20024/22/2002 12:00:00 AMPPART
shear nail terry- ###-#### Shear--ok to side--missing hd at rear/c/n issued--verify at framing. 4/22/2002 3:40:11 PM
BLD02-00440 BLD-Framing/Rough-in4/22/20024/22/20024/22/2002 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 04/22/2002 at 08:07:27. Contact: ###-####. c/n--ok to insulate 4/22/2002 3:24:20 PM
BLD02-00723 BLD-Footing4/22/20024/22/20024/22/2002 12:00:00 AMPCANC
Scheduled by a contractor via Hello! on 04/22/2002 at 08:33:49. Contact: ###-####. Cancelled by contractor 4/22/2002 1:50:09 PM
BLD02-00287 BLD-Framing/Rough-in4/22/20024/22/20024/22/2002 12:00:00 AMPPART
shear wall- ###-#### rich Shear--ok to side 4/22/2002 1:49:53 PM
MEC02-01011 Rough-in4/22/20024/22/20024/22/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 04/22/2002 at 10:53:09. Contact: ###-####.
MEC02-01011 Pressure Test4/22/20024/22/20024/22/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 04/22/2002 at 10:53:34. Contact: ###-####.
MEC02-00890 Rough-in4/22/20024/22/20024/22/2002 12:00:00 AMPCANC
Scheduled by Inspector: 420 On 4/22/2002 2:44:40 PM Cancel by inspector. 4/22/2002 2:50:02 PM
MEC02-00889 Rough-in4/22/20024/22/20024/22/2002 12:00:00 AMPPASS
Scheduled by Inspector: 420 On 4/22/2002 2:45:07 PM