MEC02-01008
| Rough-in | 4/19/2002 | 4/22/2002 | 4/22/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 04/19/2002 at 14:38:32. Contact: ###-####.
|
MEC02-01008
| Pressure Test | 4/19/2002 | 4/22/2002 | 4/22/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 04/19/2002 at 14:38:52. Contact: ###-####.
|
MEC02-01012
| Rough-in | 4/19/2002 | 4/22/2002 | 4/22/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 04/19/2002 at 14:48:19. Contact: ###-####.
|
MEC02-01074
| Final | 4/19/2002 | 4/22/2002 | 4/22/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 04/19/2002 at 16:57:15. Contact: ###-####.no power to hood 4/22/2002 10:01:51 AM
|
MEC02-01074
| Pressure Test | 4/19/2002 | 4/22/2002 | 4/22/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 04/19/2002 at 16:57:29. Contact: ###-####. below 20psi down to about 10 4/22/2002 10:02:39 AM
|
BLD02-00298
| BLD-Framing/Rough-in | 4/19/2002 | 4/22/2002 | 4/22/2002 12:00:00 AM | A | PART |
|
|
shear nail\\###-#### ok to cover ext 4/22/2002 9:13:39 AM
|
BLD01-00874
| BLD-Energy code compliance | 4/19/2002 | 4/22/2002 | 4/22/2002 12:00:00 AM | P | FAIL |
|
|
NICK -SHEAR c/n on site 4/22/2002 3:03:50 PM
|
BLD02-00305
| BLD-Framing/Rough-in | 4/22/2002 | 4/22/2002 | 4/22/2002 12:00:00 AM | P | NR |
|
|
fr re-insp-- ###-#### aaron still needs to finish mec c/n items and elec r/i 4/22/2002 3:37:46 PM
|
BLD01-02419
| BLD-Final | 4/22/2002 | 4/22/2002 | 4/22/2002 12:00:00 AM | P | NR |
|
|
fn occ todd- ###-#### still needs other sign offs 4/22/2002 1:41:02 PM
|
BLD01-03213
| BLD-Framing/Rough-in | 4/22/2002 | 4/22/2002 | 4/22/2002 12:00:00 AM | P | PART |
|
|
###-#### second floor calls for shear panels on the se and sw corners these are int walls need to install or get engineer alt 4/22/2002 1:44:27 PM
|
BLD01-02844
| BLD-Framing/Rough-in | 4/22/2002 | 4/22/2002 | 4/22/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 04/22/2002 at 10:33:29. Contact: ###-####.
|
BLD02-00536
| BLD-Foundation | 4/22/2002 | 4/22/2002 | 4/22/2002 12:00:00 AM | P | PART |
|
|
FOUND WALL BART- ###-#### work in progress all rebar is in 4/22/2002 1:41:41 PM
|