FIR03-00007
| INSP-Sprinkler Rough-in/Hydro | 4/21/2003 | 4/22/2003 | 4/22/2003 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 4/21/2003 at 10:38:05 AM.
|
FIR03-00068
| INSP-Sprinkler Rough-in/Hydro | 4/21/2003 | 4/22/2003 | 4/22/2003 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 4/21/2003 at 11:31:44 AM. Contact: ###-####. need hangers on third floor; encroaching into fire proofing on second; Mike is going to check with GC about it 4/22/2003 4:19:26 PM
|
FIR02-00385
| INSP-Sprinkler Rough-in/Hydro | 4/22/2003 | 4/22/2003 | 4/22/2003 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 4/22/2003 at 6:42:45 AM. Contact: ###-####. stated 24 hr air test; 40.5 psi and freezer is at -22 degrees F. 4/22/2003 1:08:24 PM
|
FIR03-00195
| INSP-Final Inspection | 4/22/2003 | 4/22/2003 | 4/22/2003 12:00:00 AM | P | CANC |
|
|
TYLER ###-####--CANCEL NEEDED THE BLD #
|
BLD03-00171
| FIRE-Final Inspection | 4/22/2003 | 4/22/2003 | 4/22/2003 12:00:00 AM | P | PART |
|
|
TYLER--###-#### per Troy and Sam Rogers temp occ approved for Fire pending submittal/approval of alarm plans 4/22/2003 1:33:44 PM
|
FIR03-00178
| INSP-Final Inspection | 4/22/2003 | 4/22/2003 | 4/22/2003 12:00:00 AM | P | PART |
|
|
todd; Phone #: ###-#### Internet Inspection Request from: Darla Downs installed per plans; insulation hanging down and not installed in area by hood; will need to recheck at final 4/22/2003 2:01:36 PM
|