FIR05-00203
| INSP-Final Inspection | 4/21/2005 | 4/22/2005 | 4/22/2005 5:14:12 PM | | FAIL |
|
|
Replace fusible link and solder pendents in entry with QR as noted in plan review comment #10. Provide current inspection tag on riser. Install ceiling tile around pendent heads prior to final. Space head in laundry room for ordinary hazard req.
|
FIR05-00039
| INSP-Sprinkler Rough-in/Hydro | 4/22/2005 | 4/22/2005 | 4/22/2005 3:18:11 PM | P | PART |
|
|
Fire supply UG stub out good for cover, will require as-built for additional 90 okayed by Bill A. per Jim Danes.
|
BLD03-01644
| FIRE-Final Inspection | 4/22/2005 | 4/22/2005 | 4/22/2005 12:02:21 PM | A | PASS |
|
|
Fire life safety finaled.
|
BLD05-00484
| FIRE-Final Inspection | 4/22/2005 | 4/22/2005 | 4/22/2005 11:58:30 AM | P | PASS |
|
|
Fire life safety finaled.
|
FIR05-00107
| INSP-Final Inspection | 4/21/2005 | 4/22/2005 | 4/22/2005 11:55:39 AM | A | PART |
|
|
Overhead rough-in pass, need ceiling tile installed around pendent heads for final.
|
FIR05-00047
| INSP-Final Inspection | 4/21/2005 | 4/22/2005 | 4/22/2005 11:53:29 AM | A | FAIL |
|
|
Head overspaced in file and photocopy room. Provide fire caulk at penetration of line in riser room.
|
FIR04-00807
| INSP-Final Inspection | 4/21/2005 | 4/22/2005 | 4/22/2005 11:50:31 AM | A | FAIL |
|
|
Pipe size installed in mechanical room does not meet requirements of note #2 on review comments.
|
FIR04-00658
| INSP-Final Inspection | 4/20/2005 | 4/22/2005 | 4/22/2005 9:26:04 AM | A | PART |
|
|
Fire alarm 2nd floor pass inspection.
|
FIR04-00685
| INSP-Alarm Testing | 4/22/2005 | 4/22/2005 | 4/22/2005 12:00:00 AM | A | PASS |
|
|
Fire alarm finaled.
|