BLD07-02401
| FIRE-Final Inspection | 4/22/2008 | 4/22/2008 | 4/22/2008 4:01:38 PM | P | PART |
|
|
A temporary occupancy was given with mark sentennos permission for the use of the conference room. The other portions of this scope of work have not been completed. I notified the builder that the temp was only good for 90 days
|
BLD07-02809
| FIRE-Final Inspection | 4/22/2008 | 4/22/2008 | 4/22/2008 1:57:39 PM | P | PASS |
|
|
Life safety passed.
|
FIR08-00165
| INSP-Sprinkler Rough-in | 4/21/2008 | 4/22/2008 | 4/22/2008 1:57:00 PM | A | PASS |
|
|
Three additional rooms have been approved for cover and have been marked on the city approved plans.
|
BLD06-00715
| FIRE-Final Inspection | 4/21/2008 | 4/22/2008 | 4/22/2008 9:54:40 AM | A | PASS |
|
|
fire life safety passed
|