Inspections for the day of: Wednesday, April 22, 2009.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBill VanDegrift
TitlePLM-INSPECTOR
Phone #794-9372
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM08-02479 Other4/22/20094/22/20094/22/2009 4:35:23 PMPPASS
checked up on mh that seemed to show some water on camera. looked ok.
PLM09-00584 Final4/22/20094/22/20094/22/2009 3:06:41 PMPPASS
Tayna Phone #: ###-####
ESC08-00789 Random Inspection4/22/20094/22/20094/22/2009 1:51:09 PMPPART
working in the concrete gutter along the road taking care of the tracking and sweeping as they go.
PLM08-02756 Final4/22/20094/22/20094/22/2009 1:43:00 PMPNR
rv dump station incomplete.
PLM08-02703 Final4/22/20094/22/20094/22/2009 1:42:22 PMPFAIL
thank you Phone #: ###-#### Internet Inspection Request from: Aaron Johns R.P. required on line to R.v. dump. complete R.V. dump station and post water station per UPC. test R.P. and DCVA.
ESC07-01179 Site Final4/22/20094/22/20094/22/2009 10:01:48 AMAPASS
ESC07-01176 Aging Inspection4/22/20094/22/20094/22/2009 9:53:57 AMAPASS
ESC07-01176 Site Final4/22/20094/22/20094/22/2009 9:53:44 AMAPASS
site stabilized
ESC07-01328 Site Final4/22/20094/22/20094/22/2009 9:52:08 AMAPASS
site stabilized
ESC06-00449 Aging Inspection4/22/20094/22/20094/22/2009 9:38:06 AMAPASS
ESC06-00449 DOC - Permit Expired4/22/20094/22/20094/22/2009 9:37:55 AMPPASS
ESC08-00893 Random Inspection4/22/20094/22/20094/22/2009 9:34:03 AMAPASS
looks good
ESC08-00457 Random Inspection4/22/20094/22/20094/22/2009 9:31:12 AMAPART
drying out
PLM08-02297 Plumbing Rough-in4/21/20094/22/20094/22/2009 9:24:35 AMAPART
JOB CONTACT IS AB JENSEN Phone #: ###-#### Internet Inspection Request from: ADAM WARR special ed restroom and hand sink in next room north ok. roof drains need s.s. 1/4 bends in horizontal to horizontal and vertical to horizontal offsets.