Inspections for the day of: Wednesday, April 22, 2009.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBob Reichert
TitleELE-INSPECTOR
Phone #794-1923
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE09-00119 ELE-Aging Inspection4/22/20094/22/20094/23/2009 9:57:13 AM DONE
looked at sign, see final, no esc this project
ELE09-00633 Electrical Rough-In4/22/20094/22/20094/22/2009 4:07:09 PMPPASS
Phone #: ###-#### Internet Inspection Request from: nathan palmer called ontractor, talked about 1 1/4", and jetted tub access for final, ric ok, no esc this project
ESC08-01047 General Inspection4/22/20094/22/20094/22/2009 3:52:45 PMPPASS
looked ok
ESC07-00904 General Inspection4/22/20094/22/20094/22/2009 3:50:42 PMPPASS
looked ok
ELE09-00086 Final4/22/20094/22/20094/22/2009 3:37:02 PMPPASS
saw sign, ok to final, no esc this project
ELE09-00087 Final4/22/20094/22/20094/22/2009 2:59:50 PMPPASS
saw sign, ok to final, no esc this project
ELE09-00179 Permanent Service4/22/20094/22/20094/22/2009 2:41:46 PMPPASS
Contact: Jeremiah Goins Phone #: ###-#### Internet Inspection Request from: Melissa Kaae p/s u/g n ok, no esc this project
ELE09-00687 Permanent Service4/22/20094/22/20094/22/2009 1:36:56 PMPPASS
james Phone #: ###-#### check at final 8' clearance over roof, and size of service (looks like 150A minimum) rest ok, p/s o/h rec ok, no esc this project
ELE09-00474 Electrical Rough-In4/22/20094/22/20094/22/2009 12:36:54 PMPPASS
ric ok
ELE09-00474 Final4/22/20094/22/20094/22/2009 12:36:34 PMPPASS
ok to final, signed structural card
ELE09-00474 Permanent Service4/22/20094/22/20094/22/2009 12:35:34 PMPPASS
p/s u/g rec ok
ELE09-00474 Final4/22/20094/22/20094/22/2009 12:32:43 PMPPASS
Rough In + Final inspection. Please call Craig Avery @ ###-#### 30mins prior to inspection to gain entry. Craig Avery has the key to get into the building. Phone #: ###-#### Internet Inspection Request from: Kristopher Wilson ok to final
ELE09-00671 Final4/21/20094/22/20094/22/2009 9:56:40 AMAPASS
Sid- access only through back door Phone #: ###-#### ok to final, called contractor, no card to sign, no esc this project
ELE09-00167 Electrical Rough-In4/21/20094/22/20094/22/2009 9:11:01 AMAPASS
call to meet Phone #: ###-#### Internet Inspection Request from: mark morris ok to cover ceiling anop, no esc this project
ELE09-00685 Electrical Rough-In4/22/20094/22/20094/22/2009 9:04:00 AMPCANC
Call Jim for the inspection of pole bases and trenching. Phone #: ###-#### Internet Inspection Request from: Todd Sellman Inspection cancelled from web by: Todd Sellman
ELE07-03280 Electrical Rough-In4/21/20094/22/20094/22/2009 8:53:31 AMAPASS
Scheduled by a contractor via Hello! on 4/21/2009 at 6:52:50 AM. Contact: ###-####. ok to cover walls only anop, no esc this project
ELE08-00373 Electrical Rough-In4/21/20094/22/20094/22/2009 8:06:38 AMAPART
john Phone #: ###-#### ok to cover ceilings anop