Inspections for the day of: Wednesday, April 22, 2009.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR08-00699 INSP-Sprinkler Rough-in4/22/20094/22/20094/22/2009 6:12:59 PMPPART
Inspection for overhead cover at attic branchlines and upright heads at the kitchen, multi-use, front office and mechanical areas okayed for cover-See annotations on plans with today's date. Seismic bracing not yet installed to be verified at next inspection. Discussed field changes at the gym due to ceiling finishes and record drawings to be provided.
FIR08-00624 INSP-Conference4/22/20094/22/20094/22/2009 6:08:25 PMPDONE
Regarding project related fire alarm permit and final inspection schedule.
BLD08-00712 FIRE-Conference4/22/20094/22/20094/22/2009 6:07:01 PMPDONE
Regarding fire life safety requirements for project final.
FIR09-00138 INSP-Final Inspection4/21/20094/22/20094/22/2009 6:04:40 PMAPASS
Fire alarm testing passed, room 205 and 206 descriptors to be addressed as agreed.
FIR09-00194 INSP-Final Inspection4/21/20094/22/20094/22/2009 2:44:42 PMAPASS
Fire sprinkler system modifications per the scope of work passed inspection, permit finaled.
BLD09-00156 FIRE-Final Inspection4/22/20094/22/20094/22/2009 2:43:22 PMAFAIL
Existing office area at the vanilla TI is lacking sufficient fire sprinkler coverage and proper spacing per NFPA 13. Items include an office missing protection, overspacing at the entry lobby, two rooms with min./max. spacing issues. Fire sprinkler system modifications will require a separate permit- see project description and item #8 on the general notes on approved plan set.
FIR08-00234 INSP-Alarm Testing4/20/20094/22/20094/22/2009 2:38:11 PMPPART
Completed smoke alarm testing for all units at floors 5,6,and 7, primary and alternate floor recall for the new elevator including fire hat functions tested okay, 4th floor fire alarm testing passed. NOTE: Missing equipment to test the heat detectors at the 3rd, 4th and elevator machine room, shunt trip and voltage monitoring also needs tested, smoke detector at the 5th floor elevator lobby failed to operate, plans indicate heat and smoke detection in the hoistway which is not installed-devices are located in the machine room, need to locate duct detectors for testing at the 5th, 6th and 7th floors, flow switch at the 9th floor needs repair/retest.