FIR09-00030
| INSP-Sprinkler Rough-in/Hydro | 4/21/2009 | 4/22/2009 | 4/22/2009 4:03:29 PM | P | PASS |
|
|
The rough-in inspection for the basement and the overhead piping passed except for the new addition piping which has not been installed yet. Also the above ground hydro test passed. A 4" backflow has been installed instead of the 3" as shown on the plans. The friction loss for the 4" is actually less than that of the 3". The manufacturer and model are the same so I will be ok with its installation.
|
BLD08-01015
| FIRE-Final Inspection | 4/22/2009 | 4/22/2009 | 4/22/2009 3:49:10 PM | P | PASS |
|
|
life safety passed
|
FIR09-00130
| INSP-Final Inspection | 4/20/2009 | 4/22/2009 | 4/22/2009 2:20:04 PM | P | PASS |
|
|
The interconnection between the releasing panel and the new facp panel tested ok. To final this permit the elevator recall and updated map at the facp is required.
|
FIR09-00177
| INSP-Sprinkler Rough-in/Hydro | 4/21/2009 | 4/22/2009 | 4/22/2009 2:18:49 PM | P | PASS |
|
|
The underground hydro test passed.
|
FIR09-00177
| INSP-Sprinkler Rough-in/Hydro | 4/21/2009 | 4/22/2009 | 4/22/2009 1:51:10 PM | A | PASS |
|
|
The underground flush passed.
|
FIR09-00019
| INSP-Alarm Testing | 4/21/2009 | 4/22/2009 | 4/22/2009 10:24:03 AM | A | PASS |
|
|
Permit finaled.
|
FIR06-00469
| INSP-Sprinkler Rough-in/Hydro | 4/21/2009 | 4/22/2009 | 4/22/2009 10:21:03 AM | A | PASS |
|
|
Permit finaled
|
BLD08-02508
| FIRE-Final Inspection | 4/21/2009 | 4/22/2009 | 4/22/2009 7:44:35 AM | A | PASS |
|
|
Life safety passed. Mark Sentenno and Scott Arleno ok'd the gates and access roadway
|