Inspections for the day of: Wednesday, April 22, 2009.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR09-00030 INSP-Sprinkler Rough-in/Hydro4/21/20094/22/20094/22/2009 4:03:29 PMPPASS
The rough-in inspection for the basement and the overhead piping passed except for the new addition piping which has not been installed yet. Also the above ground hydro test passed. A 4" backflow has been installed instead of the 3" as shown on the plans. The friction loss for the 4" is actually less than that of the 3". The manufacturer and model are the same so I will be ok with its installation.
BLD08-01015 FIRE-Final Inspection4/22/20094/22/20094/22/2009 3:49:10 PMPPASS
life safety passed
FIR09-00130 INSP-Final Inspection4/20/20094/22/20094/22/2009 2:20:04 PMPPASS
The interconnection between the releasing panel and the new facp panel tested ok. To final this permit the elevator recall and updated map at the facp is required.
FIR09-00177 INSP-Sprinkler Rough-in/Hydro4/21/20094/22/20094/22/2009 2:18:49 PMPPASS
The underground hydro test passed.
FIR09-00177 INSP-Sprinkler Rough-in/Hydro4/21/20094/22/20094/22/2009 1:51:10 PMAPASS
The underground flush passed.
FIR09-00019 INSP-Alarm Testing4/21/20094/22/20094/22/2009 10:24:03 AMAPASS
Permit finaled.
FIR06-00469 INSP-Sprinkler Rough-in/Hydro4/21/20094/22/20094/22/2009 10:21:03 AMAPASS
Permit finaled
BLD08-02508 FIRE-Final Inspection4/21/20094/22/20094/22/2009 7:44:35 AMAPASS
Life safety passed. Mark Sentenno and Scott Arleno ok'd the gates and access roadway