FIR10-00136
| INSP-Final Inspection | 4/22/2010 | 4/22/2010 | 4/22/2010 6:15:14 PM | P | NR |
|
|
Field modifications pending.
|
BLD10-00585
| FIRE-Final Inspection | 4/22/2010 | 4/22/2010 | 4/22/2010 6:12:23 PM | P | DEFR |
|
|
Scheduled 4/26 A.M.
|
BLD09-02173
| FIRE-Conference | 4/22/2010 | 4/22/2010 | 4/22/2010 12:22:12 PM | P | DONE |
|
|
Regarding new exiting at the 2nd floor to grade north side of the building.
|
BLD09-01803
| FIRE-Final Inspection | 4/21/2010 | 4/22/2010 | 4/22/2010 12:15:27 PM | A | FAIL |
|
|
See correction notice with plan set on site.
|
BLD09-01723
| FIRE-Final Inspection | 4/21/2010 | 4/22/2010 | 4/22/2010 12:11:05 PM | A | NR |
|
|
Project related fire alarm and sprinkler permits must be finaled prior to fire life safety approvals. Discussed FA work in progress, FP rough-in passed- finals pending.
|
FIR09-00536
| INSP-Sprinkler Rough-in | 4/21/2010 | 4/22/2010 | 4/22/2010 12:07:48 PM | A | PART |
|
|
The remainder of overhead rough-in at the second floor drop ceilings is approved for cover including the main corridor and perimeter rooms. Verified fire resistive coatings at exposed wood above the ceiling grid, noted ball valve at one drop sprinkler head to be removed at the north end of the corridor.
|
FIR10-00180
| INSP-Final Inspection | 4/21/2010 | 4/22/2010 | 4/22/2010 9:32:30 AM | P | CANC |
|
|
please call Bill at ###-#### with time Inspection requested from web by: Lori Brungardt Phone #: ###-#### Inspection cancelled from web by: Lori Brungardt
|