Inspections for the day of: Thursday, April 22, 2010.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC10-00225 Site Preparation4/15/20104/22/20104/22/2010 4:43:32 PMANR
ESC10-00262 Site Preparation4/22/20104/22/20104/22/2010 4:17:57 PM FAIL
Correction Notice: (Given to RP)
1. CLean up all sediment and debris off of all hard surfaces.
2. Place external protection as secondary protection or the storm drain.
3. Place all trash debris into a container or the containerized trailer that is provided.
Will re-inspect on 4/26/10AM.
ESC10-00261 Site Preparation4/22/20104/22/20104/22/2010 4:17:48 PM FAIL
Correction Notice: (Given to RP)
1. CLean up all sediment and debris off of all hard surfaces.
2. Place external protection as secondary protection or the storm drain.
3. Place all trash debris into a container or the containerized trailer that is provided.
Will re-inspect on 4/26/10AM.
ESC10-00212 Site Preparation4/21/20104/22/20104/22/2010 11:26:05 AMAPART
Prior to the footing pour date, must provide an external washout. Will be contqacted by the RP to verify the implementation of the washout. Will re-inspect on 5/3/10am
ESC10-00246 Site Preparation4/15/20104/22/20104/22/2010 10:42:06 AMAFAIL
Verbal message to RP:
provide a washout pit for any and all additional concrete washout and any and all Non VOC products. Will re-inspect on 4/26/10AM.
ESC10-00010 BMP Violation4/22/20104/22/20104/22/2010 9:49:34 AMPFAIL
Correction Notice:
1. Add additional material or High visability construction fence with T-post an both end of the new Barber Rd.
2. Install the rolled erosion control blanket within the storm water channel in the whole channel per the manufactures specifications. Also provide the city with the specifiactions to verify.
3. Provide the proper info regarding the RP on the ESC sign.
* Failure to comply will result in a stop work order. Will re-inspect on 4/26/10AM.
ESC10-00088 General Inspection4/21/20104/22/20104/22/2010 9:00:27 AMAPASS
Refer to written correction notice which is posted on front window and to permit history.
ESC10-00052 Tracking Control4/22/20104/22/20104/22/2010 8:56:03 AMAFAIL
Verbal to roth RP's:
Clean up all tracking and recommend a roughening of the stabilized construction access. ALso include Adam Lyman into the city system for the RP since he is listed on the ESC sign. Willl follow up of correction on 4/23/10PM.
ESC10-00240 General Inspection4/21/20104/22/20104/22/2010 8:45:34 AMAPART
still nee to provide a seperate washout for any and tool cleaning of non VOC products.
ESC10-00235 BMP Violation4/20/20104/22/20104/22/2010 8:44:26 AMAPASS
ESC10-00210 BMP Violation4/20/20104/22/20104/22/2010 8:44:10 AMAPASS
ESC10-00210 General Inspection4/21/20104/22/20104/22/2010 8:42:56 AMAPASS
ESC10-00253 General Inspection4/20/20104/22/20104/22/2010 8:42:28 AMAPASS
SIGN??