GCB13-00001
| GCB-Fndatn/slab ins/fld vent | 4/19/2013 | 4/19/2013 | | P | |
|
|
Mark ###-#### rebar inspection requested
|
MIS12-00194
| MIS-Aging Inspection | 4/22/2013 | 4/22/2013 | 4/24/2013 11:10:13 AM | | PEND |
|
|
|
BLD13-00301
| BLD-Framing/Rough-in | 4/19/2013 | 4/22/2013 | 4/23/2013 9:18:26 AM | P | PASS |
|
|
tim Phone #: ###-####
|
BLD13-00443
| BLD-Framing/Rough-in | 4/22/2013 | 4/22/2013 | 4/23/2013 7:58:56 AM | P | PART |
|
|
ken Phone #: ###-####,, ok to insulate,, need fireblocks,, straps
|
BLD12-02766
| BLD-Framing/Rough-in | 4/19/2013 | 4/22/2013 | 4/22/2013 4:00:21 PM | P | PART |
|
|
Steel stud framing inspection for tack room in horse barn - site representative is Shane - ###-#### Phone #: ###-#### >> Inspection requested via web by Paul Saucerman
|
BLD13-00486
| BLD-Footing | 4/22/2013 | 4/22/2013 | 4/22/2013 2:47:58 PM | P | PART |
|
|
Mana Phone #: ###-####,,one interior point load and 2 exterior column footings ok,, work in progress
|
MIS13-00097
| BLD-Conference | 4/22/2013 | 4/22/2013 | 4/22/2013 1:38:52 PM | P | PEND |
|
|
complaint,, Talked with Todd with vertical construction,, demo work going on to see what they are dealing with,he will contact plan review,, should submit for permit this week..
|
GCB13-00016
| GCB-Framing | 4/22/2013 | 4/22/2013 | 4/22/2013 1:30:27 PM | P | PASS |
|
|
Bob ###-####
|
BLD13-00036
| BLD-Framing/Rough-in | 4/19/2013 | 4/22/2013 | 4/22/2013 12:59:45 PM | A | NR |
|
|
Phone #: ###-#### >> Inspection requested via web by Lawrence Johnson,, ok to cover exterior,, will need to retrofit a hold down.. recomend some floor to floor straps as well... need to nail or bolt sole plate down
|
GCB13-00016
| GCB-Final | 4/19/2013 | 4/22/2013 | 4/22/2013 12:22:07 PM | A | PEND |
|
|
Bob ###-####,, wanted a frame not a final,,, frame ok,, ok to insulate
|
BLD12-01778
| DOC - Permit Finaled | 4/22/2013 | 4/22/2013 | 4/22/2013 10:43:47 AM | P | PASS |
|
|
|