GCB12-00156
| GCB-Assembly | 4/21/2014 | 4/22/2014 | 4/22/2014 1:52:33 PM | P | NR |
|
|
Herb ###-#### roof nailing inspection request; partial No access.
|
MIS14-00067
| BLD-Conference | 4/17/2014 | 4/22/2014 | 4/22/2014 1:51:38 PM | A | DONE |
|
|
Check back..... Same
|
BLD14-00303
| BLD-Energy code compliance | 4/21/2014 | 4/22/2014 | 4/22/2014 11:42:48 AM | A | PASS |
|
|
eary as possible - Jeff Phone #: ###-####
|
GCB13-00151
| GCB-Final | 4/21/2014 | 4/22/2014 | 4/22/2014 11:42:26 AM | A | CANC |
|
|
Brett ###-#### Need to complete all required finals prior to calling for structural final.
|
GCB13-00155
| GCB-Final | 4/21/2014 | 4/22/2014 | 4/22/2014 11:36:28 AM | P | PASS |
|
|
Willie ###-#### Met with Andy from Clements Concrete and Aggregate concrete construction. We excavated to the footing and performed (4) rebound tests. The average of the four tests was 3229 psi (729 psi better than code). Blower door test perfomed by Momentum.........Pass at 4.7
|