FIR14-00708
| INSP-Sprinkler Rough-in | 4/22/2015 | 4/22/2015 | 4/22/2015 4:35:14 PM | P | PART |
|
|
Bldg G 1st and 2nd Floor dwelling units only ok to cover. One room on both floors missing a head per plan, verified existing coverage is sufficient. Additional heads (1 each) found (not on plan) to end rooms on 1st floor, OK'd. Additional head added in one room, both floors, to maintain coverage from door header, Ok'd.
|
FIR14-00344
| INSP-Sprinkler Rough-in | 4/22/2015 | 4/22/2015 | 4/22/2015 4:30:18 PM | P | PART |
|
|
Small area with two heads in Basement of A/B/C near elevator ok to cover.
|
FIR14-00070
| INSP-Supply line flush | 4/22/2015 | 4/22/2015 | 4/22/2015 4:29:52 PM | P | PART |
|
|
Supply line flush for bldg K completed satisfactory.
|