ESC14-00477
| Aging Inspection | 4/22/2015 | 4/22/2015 | 4/22/2015 5:00:10 PM | | CANC |
|
|
rescheduled for Friday 4-24
|
ESC14-00212
| General Inspection | 4/22/2015 | 4/22/2015 | 4/22/2015 3:30:06 PM | | PASS |
|
|
Lusk Place (Vista East) construction is ongoing. Lusk Street is being used for employee parking weekdays and periodically swept on weekends. Requested that streets be swept this weekend.
The newly installed culvert drain area has been sodded over. Hillside banks were hydroseeded/tacified. No sediment runoff from area in Anniversary Inn parking lot.
No violations, spills, or discharges observed. Approved.
|
ESC13-01231
| Random Inspection | 4/22/2015 | 4/22/2015 | 4/22/2015 2:50:03 PM | P | PART |
|
|
Noticed spill of powder material on Dale Street.
RP-project supervisor Carl with ESI informed me it was from gypcrete for the bathrooms. One of the bags leaked and has been difficult to clean. Most of the loose material has been swept, but pavement is stained.
Area will be continued to be swept and cleaned to prevent being carried off by stormwater.
Will check back. Verbal correction requested to Carl - site has been in good standing throughout project.
|
ESC14-00239
| General Inspection | 4/22/2015 | 4/22/2015 | 4/22/2015 2:38:35 PM | | PASS |
|
|
Streets and gutters surrounding complex (the Vista West) are free of trackout, spills, and sediment. DI bags have filter bag protection. Lined pit is being used for washout. No corrections needed.
Note - RP Tony no longer with ESI
|
ESC12-00130
| General Inspection | 4/22/2015 | 4/22/2015 | 4/22/2015 2:29:35 PM | | PASS |
|
|
Significant acitivity on interior of River's Edge complex. No earthwork occuring. No issues at site perimeter. No trackout, no discharges, or vehicles blocking traffic flow to Ann Morrison.
No corrections at this time.
|
ESC14-00588
| General Inspection | 4/22/2015 | 4/22/2015 | 4/22/2015 1:30:08 PM | | PASS |
|
|
No earthwork or other activity yet at site. Some heavy equipment has been parked in center of area to be developed. ESI contact stated that they would call me for site prepartion inspection once BMPs are installed. Approved
|
ESC14-00689
| General Inspection | 4/22/2015 | 4/22/2015 | 4/22/2015 12:31:04 PM | | PASS |
|
|
WIP. Near completion. RP/project supervisor stated project is in final stages and will be finished next week he anticipates. Permit is posted on gate. Earth disturbance phase is complete. No issues.
Approved.
|
ESC15-00228
| Site Preparation | 4/21/2015 | 4/22/2015 | 4/22/2015 11:32:53 AM | A | PASS |
|
|
John Phone #: ###-#### Permit posted. Trash container provided. Discussed project with RP-GC.
Need to install inlet protection on DI on Barber to the east of Old Hickory.
RP said he will install this week.
|
ESC14-00627
| Aging Inspection | 4/22/2015 | 4/22/2015 | 4/22/2015 11:26:45 AM | | PASS |
|
|
Home near completion. Landscaping in progress along with finishing touches. No violations. Shoud be done next week. Will keep permit open.
|
ESC14-00608
| General Inspection | 4/22/2015 | 4/22/2015 | 4/22/2015 11:23:45 AM | A | PART |
|
|
No trackout, fugitive dust, or sediment runoff issues at time of inspection.
Correction: Repair/replace damage fiber inlet protection throughout the subdivision. DI bags may be better alternative.
NOTE> DH Estates #13 (ESC15-00282) has already started and is okay to continue. Construction entrance installed. No issues at time of inspection.
|
ESC14-00662
| General Inspection | 4/21/2015 | 4/22/2015 | 4/22/2015 11:08:37 AM | P | PART |
|
|
Stockpiles of dirt, tree roots, concrete rubble have been hauled away and the area between Barnside and Old Hickory. Some stockpiles still remain. No trackout to Old Hickory or Warm Springs, no discharges or sediment runoff occuring.
Correction: Fix damaged fiber mat inlet protection (correction issued to Syman Co.) in DH#12
Will need to stabilize area to control dust within 2 weeks of inactivity.
|
ESC15-00376
| Site Preparation | 4/21/2015 | 4/22/2015 | 4/22/2015 10:48:53 AM | A | PASS |
|
|
###-####, please call for any issues Phone #: ###-#### Inspection requested via web by Erby Gonzales
Permit posted. Mill District Square BMPs are installed. RP Erbie is having all DI bags emptied/reinstalled today. Concrete washout has remaining capacity.
Approved.
|
ESC14-00531
| Aging Inspection | 4/22/2015 | 4/22/2015 | 4/22/2015 10:00:26 AM | | PASS |
|
|
WIP. Home is being painted on exterior. Yard is not yet landscaped. No trackout or discharges. No illicit washout activity observed. Trash contained. No corrections.
|
ESC13-00930
| General Inspection | 4/22/2015 | 4/22/2015 | 4/22/2015 9:00:03 AM | | PASS |
|
|
|
ESC14-00895
| DOC - Permit Finaled | 4/22/2015 | 4/22/2015 | 4/22/2015 8:52:34 AM | P | PASS |
|
|
|
ESC14-00895
| Aging Inspection | 4/22/2015 | 4/22/2015 | 4/22/2015 8:52:09 AM | | PASS |
|
|
Demolition complete. Permits finaled. ESC conditions satisfied.
|
ESC14-00662
| Site Preparation | 4/21/2015 | 4/22/2015 | 4/21/2015 4:52:52 PM | P | CANC |
|
|
data entry error
|