Inspections for the day of: Wednesday, April 22, 2015.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorEvan Jenkins
TitleEROSION CONTROL MANAGER
Phone #794-3958
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC15-00201 Site Preparation4/21/20154/22/20154/22/2015 1:01:57 PMPPASS
Andy-please call to meet Phone #: ###-####

Permit Posted on Large Tree infront of the project. Small shop will be constructed with an additional driveway. No ESC issues at this time.
Lot is extremely flat
ESC14-00883 Aging Inspection4/22/20154/22/20154/22/2015 11:36:18 AM PASS
ESC14-00883 DOC - Permit Finaled4/22/20154/22/20154/22/2015 11:35:58 AMPPASS
project complete
no esc issues
ESC14-00731 General Inspection4/22/20154/22/20154/22/2015 9:26:05 AM PASS
WIP: no issues at this time
ESC14-00711 General Inspection4/22/20154/22/20154/22/2015 8:59:34 AM PASS
Vegetation needs to be re-established. No discharges occuring from disturbed areas.
ESC14-00267 General Inspection4/22/20154/22/20154/22/2015 8:28:46 AM PASS
WIP: contractors roto-milled the existing surface from both 2nd and 3rd level annex parking lots. Contractor preparing to resurface both parking lots. no issues so far
ESC15-00374 Site Preparation4/21/20154/22/20154/22/2015 8:27:23 AMAPASS
Dan Phone #: ###-####

Permit Posted along front of parcel. This lot has a gentle slope towards Fenestra St. No Issues at this time.
Approved to begin construction