ELE16-00888
| Electrical Rough-In | 4/22/2016 | 4/22/2016 | 4/22/2016 3:01:08 PM | P | PASS |
|
|
Panel and Inverter listing inspection. Phone #: ###-#### Inspection requested via web by Ryan King r/i ok ul listed panels and enphase microinvertors
|
ELE16-00886
| Electrical Rough-In | 4/20/2016 | 4/22/2016 | 4/22/2016 2:51:42 PM | P | FAIL |
|
|
Patricia Phone #: ###-#### change out 2" LB condulet to a factory 90 elbow for service entrance conductors. Install tie off point for service drop. Make up all ground wires in branch circuitry leaving at least 6" free conductors in each box. Install mud ring over rebar for concrete encased electrode access.
|
ELE16-00867
| Electrical Rough-In | 4/21/2016 | 4/22/2016 | 4/22/2016 2:01:50 PM | P | PASS |
|
|
Kevin Phone #: ###-#### r/i ok 100% on walls, showwindows, (including pony walls)and bath ceilings also ok
|
ELE13-01998
| ELE-Aging Inspection | 4/22/2016 | 4/22/2016 | 4/22/2016 12:38:13 PM | | DONE |
|
|
too busy
|
ELE10-02067
| ELE-Aging Inspection | 4/22/2016 | 4/22/2016 | 4/22/2016 12:37:28 PM | | DONE |
|
|
too busy
|
ELE16-01237
| Final | 4/21/2016 | 4/22/2016 | 4/22/2016 10:33:29 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Garrett Collins final ok
|
ELE16-01237
| Electrical Rough-In | 4/21/2016 | 4/22/2016 | 4/22/2016 10:31:59 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Garrett Collins r/i ok conduit and wiring to hvac and e lights and exits
|
ELE16-00670
| Final | 4/21/2016 | 4/22/2016 | 4/22/2016 10:02:19 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Don Conley final ok
|
ELE16-01105
| Electrical Rough-In | 4/21/2016 | 4/22/2016 | 4/22/2016 9:36:17 AM | A | PASS |
|
|
Rough cover inspection. Phone #: ###-#### Inspection requested via web by Richard Montgomery r/i walls and ceilings ok new dentist offices all redundant ground wiring installed
|
ELE16-00713
| Electrical Rough-In | 4/22/2016 | 4/22/2016 | 4/22/2016 9:03:06 AM | A | PASS |
|
|
Please inspect floor heat in master. Please call if you have any questions. Thanks Shaun ###-#### Phone #: ###-#### Inspection requested via web by Shaun Kirkman r/i ok floor heat
|
ELE14-01561
| Final | 4/21/2016 | 4/22/2016 | 4/22/2016 8:22:38 AM | A | PASS |
|
|
This Has Been Done For Awhile And The Builder Had Some Work Left And Never Called Me And I Missed Getting This Finaled Out. I Apologize And Would Love To Get This Done Thanks And Call With Any Questions Or Concerns Phone #: ###-#### Inspection requested via web by jason shifflett final ok
|
ELE16-01838
| Electrical Rough-In | 4/22/2016 | 4/22/2016 | 4/22/2016 12:00:00 AM | P | PASS |
|
|
Level 3, Stack 2 Lighting Level 2: 244, 225, 227, 228, 240, 241 Level 5: 518, 513, Stack 1 C;S Walls Level 6: 634, 635, 636, 637, 638, 633, 632, 631, 630 Phone #: ###-#### Inspection requested via web by Tom Betty r/i ok see Wayne's esheets for above areas
|
ELE16-01237
| Conference | 4/21/2016 | 4/22/2016 | 4/21/2016 5:24:12 PM | A | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by Garrett Collins Inspection cancelled from web by: Garrett Collins
|