Inspections for the day of: Friday, April 22, 2016.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRex Boyles
TitleELE-INSPECTOR
Phone #685-9023
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE16-00888 Electrical Rough-In4/22/20164/22/20164/22/2016 3:01:08 PMPPASS
Panel and Inverter listing inspection. Phone #: ###-#### Inspection requested via web by Ryan King r/i ok ul listed panels and enphase microinvertors
ELE16-00886 Electrical Rough-In4/20/20164/22/20164/22/2016 2:51:42 PMPFAIL
Patricia Phone #: ###-#### change out 2" LB condulet to a factory 90 elbow for service entrance conductors. Install tie off point for service drop. Make up all ground wires in branch circuitry leaving at least 6" free conductors in each box. Install mud ring over rebar for concrete encased electrode access.
ELE16-00867 Electrical Rough-In4/21/20164/22/20164/22/2016 2:01:50 PMPPASS
Kevin Phone #: ###-#### r/i ok 100% on walls, showwindows, (including pony walls)and bath ceilings also ok
ELE13-01998 ELE-Aging Inspection4/22/20164/22/20164/22/2016 12:38:13 PM DONE
too busy
ELE10-02067 ELE-Aging Inspection4/22/20164/22/20164/22/2016 12:37:28 PM DONE
too busy
ELE16-01237 Final4/21/20164/22/20164/22/2016 10:33:29 AMAPASS
Phone #: ###-#### Inspection requested via web by Garrett Collins final ok
ELE16-01237 Electrical Rough-In4/21/20164/22/20164/22/2016 10:31:59 AMAPASS
Phone #: ###-#### Inspection requested via web by Garrett Collins r/i ok conduit and wiring to hvac and e lights and exits
ELE16-00670 Final4/21/20164/22/20164/22/2016 10:02:19 AMAPASS
Phone #: ###-#### Inspection requested via web by Don Conley final ok
ELE16-01105 Electrical Rough-In4/21/20164/22/20164/22/2016 9:36:17 AMAPASS
Rough cover inspection. Phone #: ###-#### Inspection requested via web by Richard Montgomery r/i walls and ceilings ok new dentist offices all redundant ground wiring installed
ELE16-00713 Electrical Rough-In4/22/20164/22/20164/22/2016 9:03:06 AMAPASS
Please inspect floor heat in master. Please call if you have any questions. Thanks Shaun ###-#### Phone #: ###-#### Inspection requested via web by Shaun Kirkman r/i ok floor heat
ELE14-01561 Final4/21/20164/22/20164/22/2016 8:22:38 AMAPASS
This Has Been Done For Awhile And The Builder Had Some Work Left And Never Called Me And I Missed Getting This Finaled Out. I Apologize And Would Love To Get This Done Thanks And Call With Any Questions Or Concerns Phone #: ###-#### Inspection requested via web by jason shifflett final ok
ELE16-01838 Electrical Rough-In4/22/20164/22/20164/22/2016 12:00:00 AMPPASS
Level 3, Stack 2 Lighting
Level 2: 244, 225, 227, 228, 240, 241
Level 5: 518, 513, Stack 1 C;S Walls
Level 6: 634, 635, 636, 637, 638, 633, 632, 631, 630 Phone #: ###-#### Inspection requested via web by Tom Betty r/i ok see Wayne's esheets for above areas
ELE16-01237 Conference4/21/20164/22/20164/21/2016 5:24:12 PMACANC
Phone #: ###-#### >> Inspection requested via web by Garrett Collins Inspection cancelled from web by: Garrett Collins