Inspections for the day of: Monday, April 22, 2019.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD19-01133 FIRE-Final Inspection4/22/20194/22/20194/22/2019 2:54:24 PMPFAIL
Per plan review the actual address is 175, need exit signs and emergency lights repaired and placed per the plans and per discussion with plan review.

Call for access- Stephanie Phone #: ###-####
FIR18-00429 INSP-Final Inspection4/22/20194/22/20194/22/2019 2:53:20 PMPPASS
Permit finaled

Phone #: ###-#### Inspection requested via web by Chris Green
BLD19-00866 FIRE-Final Inspection4/18/20194/22/20194/22/2019 12:20:40 PMPPASS
Life safety passed. call for access- Katie Phone #: ###-####
FIR19-00156 INSP-Sprinkler Rough-in/Hydro4/22/20194/22/20194/22/2019 12:01:43 PMPCANC
The main drain valve failed. Contact Tyler Loomis ###-#### 30 min prior to insp start please, he would like to start at 2PM if at all possible.

Thanks Phone #: ###-#### Inspection requested via web by Teri Cruickshank
FIR19-00244 INSP-Alarm Testing4/19/20194/22/20194/22/2019 11:54:59 AMPCANC
Phone #: ###-#### >> Inspection requested via web by David Ozmer Inspection cancelled from web by: David Ozmer
NAF19-00029 INSP-Final4/22/20194/22/20194/22/2019 10:24:04 AMPDONE
Life safety passed

Call prior to going Phone #: 2085778794 >> Inspection requested via mobile web by Bob
NAF18-00110 INSP-Sprinkler Rough-in/Hydro4/19/20194/22/20194/22/2019 10:21:08 AMPDONE
Inspection was actually a building/life safety conference. We went over fire extinguisher placement, door hardware and the paint hood requirements. Call prior to going Phone #: 2086065557 >> Inspection requested via mobile web by Bruce
FIR18-00525 INSP-Sprinkler Rough-in4/19/20194/22/20194/22/2019 9:28:29 AMAPASS
Rough-in complete for first and second floors. See plans fro minor corrections needed that will be verified at next inspection. Plan mods are required for changes. Todd Ketterling is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
FIR19-00156 INSP-Sprinkler Rough-in/Hydro4/22/20194/22/20194/22/2019 8:21:22 AMAFAIL
Called contact phone number but could not leave message since acount not set up. Went to job site did not find fitter and system has not been pumped up yet. No inspection performed.


Contact Tyler Loomis ###-#### 30 min prior to Hydro insp start please


Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
FIR19-00156 INSP-Sprinkler Rough-in/Hydro4/19/20194/22/20194/19/2019 9:49:45 AMPCANC
Contact Tyler Loomis ###-#### 30 Min prior to Hydro Insp. start please.

Thank YOU Phone #: ###-#### >> Inspection requested via web by Teri Cruickshank Inspection cancelled from web by: Teri Cruickshank